web analytics
$10,000,000$13,600,000/EBITDA

The Hydroelectric Project represents a premier, high-yield renewable energy asset strategically situated in the water-abundant mountainous region of southern Kazakhstan. Currently at the Ready-to-Build (RTB) stage, this 50MW run ...

$10,000,000$13,600,000/EBITDA
$13,600,000
TBD

XXXXXXXX SA is a Swiss corporation (Aktiengesellschaft) headquartered in the prominent business hub of Zug. Established in 2014 , the company operates as a specialized boutique firm focused on providing high-level consulting and ...

TBD
TBD
TBD
Spain | Sport | L#20261072

This is a  proprietary, off-market investment opportunity to acquire a controlling stake or strategic equity position in a premier professional football club within the Spanish First Division (La Liga). Positioned within one o ...

TBD
TBD
$26,800,000$3,600,000/EBITDA

This offering represents a premier opportunity to acquire or partner with a vertically integrated Brazilian agribusiness enterprise specializing in the industrial processing of high-value corn derivatives for both human consumptio ...

$26,800,000$3,600,000/EBITDA
$3,600,000
$1,450,000TBD/EBITDA
education platform for sale
Morocco | Education | L#20261069

Overview An established private higher education institution in Morocco is seeking a strategic investor or operating partner to accelerate its next phase of growth and repositioning. The institution has operated for nearly three ...

$1,450,000TBD/EBITDA
TBD
TBD
European cannabis genetics company
Germany | Distributor | L#20261068

Multiple licensed German pharmaceutical distribution companies holding GDP and narcotics authorizations for the distribution of medical cannabis. These turnkey platforms enable immediate market entry into Germany with fully compli ...

TBD
TBD
$7,000,000$6,000,000/EBITDA
medical cannabis cultivation business for sale

Fully licensed, export-ready Colombian cultivation and processing platform with GACP certification, EU-GMP Part I approval, and established EU distribution access. Proven export execution with ~1 tonne already shipped into Europea ...

$7,000,000$6,000,000/EBITDA
$6,000,000
€7,000,000TBD/EBITDA
cannabis e-commerce platform for sale

A unique opportunity to acquire a diversified, vertically integrated cannabis group comprising: A 30-year legacy Dutch seed bank and global genetics brand A centrally located Amsterdam retail store and international e-co ...

€7,000,000TBD/EBITDA
TBD
$1,000,000
Mobile Safety Technology Asset
Taiwan | Application | L#20261064

An opportunity to acquire a proprietary mobile safety technology asset focused on automated emergency escalation in situations where a user is unable to physically operate their smartphone. The platform is an Android-based, on- ...

$1,000,000
TBD

For Sale For Sale

The Hydroelectric Project represents a premier, high-yield renewable energy asset strategically situated in the water-abundant mountainous region of southern Kazakhstan. Currently at the Ready-to-Build (RTB) stage, this 50MW run-of-river facility is engineered to capitalize on optimal hydrological conditions, delivering a projected annual generation capacity of 233.97 GWh of clean, baseload electricity. This project is the HPP-1, a milestone engineering endeavor located on the hydro-energetically rich Bukhtarma River in the Altai District, East Kazakhstan Region.

Investment Highlights

  • Secured Revenue Stream: Fully backed by a long-term Government Power Purchase Agreement (PPA), ensuring predictable, inflation-indexed cash flows and mitigating off-taker risk.

  • Strategic Infrastructure: The asset features a state-of-the-art concrete gravity dam, advanced generation facility, and dedicated substation infrastructure seamlessly integrated into the national grid.

  • ESG & Sustainability Impact: By generating over 233 GWh of zero-emission power annually, the plant will offset significant carbon emissions, directly supporting Kazakhstan’s national transition toward carbon neutrality.

  • Shovel-Ready Status: All primary environmental permits, land rights, and grid-connection approvals have been secured, allowing immediate commencement of civil works.

Technical Profile

Parameter Specification
Capacity 50 MW
Annual Yield 233.97 GWh
Project Stage Ready-to-Build (RTB)
Offtake Structure Sovereign-backed Government PPA
Asset Type Run-of-River Hydroelectric

Operational Mandate: Managed by a seasoned team of regional engineers and international energy experts, the project utilizes real-time telemetry and advanced hydrological modeling to optimize flow management and maximize generation efficiency.

  • Installed Capacity: 50 MW

  • Projected Annual Output: 233.97 GWh

  • Power Purchase Agreement (PPA): Fixed tarif, KZT 38.99 with RFC KEGOC (GOV) – $0.08 USD (8 US cents)
  • Structural Innovation: A 35.87-meter-high gravel-sand dam featuring an elastic composite geomembrane core, uniquely engineered to withstand deep sedimentary foundations and up to magnitude-8 seismic events.

  • Turbine Configuration: 4x high-efficiency Axial-flow Kaplan units (12.5 MW each) designed for optimized performance across volatile annual flow regimes.

  • Grid Infrastructure: Fully integrated via a 15.5 km double-circuit 110 kV line coupled with a state-of-the-art Gas Insulated Switchgear (GIS) substation for extreme climate reliability.

  • Commercial Viability: De-risked via a secured, long-term Power Purchase Agreement (PPA) featuring a guaranteed tariff of 38.99 KZT/kWh for 20 years.

Operational & Engineering Capabilities

This firm differentiates itself through an integrated project delivery framework that covers every critical milestone of large-scale renewable development:

  • Hydrological Excellence: Leveraging over 65 years of continuous historical flow data (1956–2022) to precisely model asset capacity factors and design for 1-in-500-year extreme flood events

  • Global Contracting Alliances: Partnering with world-class engineering organizations, including the East Kazakhstan branch of the China International Water & Electric Corporation, ensuring projects are delivered on time, within budget, and to international standard specifications.

  • Asset Digitalization: Transitioning toward fully automated, “staff-less” plant capabilities via modern SCADA architectures, redundant PLC gate-control systems, and predictive maintenance technologies.

Financial Soundness & Governance

The Owner maintains an institutional-grade financial footprint, utilizing a disciplined capital deployment model optimized for capital-intensive infrastructure projects.

  • Optimal Capital Structuring: Assets are typically capitalized through a highly structured 30% Equity / 70% Debt financing framework, maintaining robust debt service coverage ratios (DSCR).

  • Long-Term Predictability: Revenue streams are shielded from market volatility through government-backed, long-term off-take mechanisms, offering investors predictable, infrastructure-grade yield profiles.

  • Rigorous Risk Management: From extensive preliminary geotechnical drilling to rigorous ESG alignment, every project undergoes comprehensive risk mitigation prior to financial close.

Financial Forecast

Parameter / Metric Conservative Scenario ($65/MWh) Base Scenario ($75/MWh) Optimistic Scenario ($85/MWh)
Installed Capacity 50 MW 50 MW 50 MW
Secured Annual Generation 240,000 MWh 240,000 MWh 240,000 MWh
Estimated Gross Revenue ~$15,600,000 USD ~$18,000,000 USD ~$20,400,000 USD
Estimated OPEX (O&M, Admin, Insurance) ~$2,000,000 USD ~$2,200,000 USD ~$2,400,000 USD
Estimated EBITDA ~$13,600,000 USD ~$15,800,000 USD ~$18,000,000 USD
EBITDA Margin ~87% ~88% ~88%

MergersCorp M&A
International As Seen On

  • brand 1
  • brand 1
  • brand 1
  • brand 1
  • brand 1