web analytics
$12,500,000TBD/EBITDA

Kazakhstan has abundant hydro resources, which are mainly concentrated in the eastern and southern parts of the country.  Today, 15 large hydropower stations (>50 MW) with a total capacity of 2.25 GW account for up to 13 per c ...

$12,500,000TBD/EBITDA
TBD
$100,000,000TBA/EBITDA

This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300mln ton accumulated from 40 yrs of operation Resource Analysis Wardell Armstrong (M ...

$100,000,000TBA/EBITDA
TBA
$6,500,000TBA/EBITDA

The company offers the supply of a wide range of oil and gas, non-standard equipment, pressure vessels and metal structures of various types and complexity, as well as block-complete equipment in accordance with the requirements o ...

$6,500,000TBA/EBITDA
TBA
$104,000,000TBA/EBITDA

Producing oilfield located in Mangystau region of Kazakhstan, the Company owns subsoil use rights for exploration and production of crude oil and gas condensate in Mangystau region of Kazakhstan. Neighboring oilfields include T ...

$104,000,000TBA/EBITDA
TBA
$3,500,000TBA/EBITDA
Kazakhstan | Aviation | L#20230425

For sale is an operating business airline, a fully certified operating airline with a high level of profitability. • The fleet consists of 14x Antonov An-2 aircraft (all aircraft are operational, certified, in good condition) ...

$3,500,000TBA/EBITDA
TBA
property

33MW 4x HPP Hydro Power Plant

EBITDA

TBD

Gross

TBD

Price

$12,500,000
property

Copper Mining Business with a SX-EW plant (JORC certified)

EBITDA

TBA

Gross

TBA

Price

$100,000,000
property

Manufacturer of Oil & Gas Equipments

EBITDA

TBA

Gross

TBA

Price

$6,500,000
property

Established Producing Oilfield Business

EBITDA

TBA

Gross

TBA

Price

$104,000,000
property

Historical Certified Operating Airline Company

EBITDA

TBA

Gross

TBA

Price

$3,500,000

Businesses for sale in Kazakhstan

Kazakhstan, the largest landlocked country, unfolds its vast landscapes and cultural richness in the heart of Central Asia. Nur-Sultan, the futuristic capital, showcases modern architecture against the serene Ishim River. Almaty, the former capital, nestled in the Tien Shan mountains, combines Soviet-era charm with a cosmopolitan vibe. The Charyn Canyon's red rock formations and the surreal landscapes of the Singing Dunes add a touch of natural grandeur. Kazakhstan's nomadic heritage resonates in traditions like eagle hunting on the steppes. With a tapestry of diverse ethnicities and a commitment to space exploration, Kazakhstan invites exploration into a realm where history, nature, and innovation converge.

Kazakhstan has abundant hydro resources, which are mainly concentrated in the eastern and southern parts of the country.  Today, 15 large hydropower stations (>50 MW) with a total capacity of 2.25 GW account for up to 13 per cent of the country’s total generating capacity.

Kazakhstan positions itself as a promising country for the development and implementation of hydropower projects on its territory. The state sets an ambitious plan of achieving the 50% share of electricity production in the country using renewable energy sources by 2050 (hereinafter – the “RES”).

Hydro energy resources are distributed throughout the country, but three areas have particularly large resources: the Irtysh River basin and its main tributaries (Bukhtarma, Uba, Ulba, Kurchum, Kardzhil), the southeast zone with the Ili river basin, and the south zone with the Syrdarya, Talas and Chu river basins.

Overview

The purpose of the Project is the construction of 4x cascade of small HPPs with a total capacity of 33.00 MW

The project has a local and regional scope. The project is intended to cover the basic part of the electrical load schedules of the Almaty power center, Almaty region of the Republic of Kazakhstan. The cascade on the River consists of 4x small hydropower plants. Each HPP of the cascade is a combination of hydraulic structures and technological equipment, convert the gravitational energy of water into mechanical energy of the flow and then into electrical energy, which is subsequently delivered to consumers.

Keypoints

  • Status: Ready to Build
  • Project Objectives: Construction of a cascade of small HPPs in the Almaty region for: a source of environmentally friendly electricity for supply to consumers in the Almaty region; increasing the reliability of the energy system of the region. – reducing the shortage of electricity in the Almaty region.
  • Installed capacity: 33 MW (Estimated)
  • Electricity generation: 140 GW / Year (Estimated)
  • Electricity tariff with VAT/without VAT: 41,23 Tenge per kWh (0,093 USD / kW)
    Technology: Hydro units with radial-axial turbines (2x Turbine “Ossberger” for 4 HPPs)

MergersCorp M&A
International As Seen On

  • brand 1
  • brand 1
  • brand 1
  • brand 1
  • brand 1