| Power Plant |
Portfolio consisting of 3 facilities in Northern Italy |
| Region |
Parma; Friuli; Turin |
| River |
Fiume Taro; River Natisone; Dora Riparia |
| Catchment Area |
Between 320 km² and 2,000 km² |
| Average Flow Rate |
5.5 m³/s – 6.5 m³/s |
| Concession Valid Until |
2034 (Parma); 2047 (Friuli); 2046 (Turin) |
| Fall Height (MQ) |
3 to 4 m |
| Nominal Power |
260 kW; 240 kW; 506 kW |
| Average Production (per plant) |
600 MWh/a; 600 MWh/a; 1,500 MWh/a |
| Total Annual Production (Portfolio) |
Approx. 2.7 GWh |
| Turbines |
2× Snail (Hydroalp); 2× Snail (HPG); 1× Chaplain (Scotta) |
| Transformers |
SEA Spa 400 kVA; Electrotransformer 250 kVA; Elettromeccanica Piossasco 700 kVA |
| Transformer Ratio |
Mostly 0.4 / 10 kV |
| Network Connection |
In the immediate vicinity of the power plants |
| Access |
Right-of-way exists for access to all power plants |
| Commissioning |
2017 / 2018 |
| Feed-in Tariff |
Average 21 cent/kWh |
| Tariff Validity |
Friuli & Parma: end of 2037 / beginning of 2038Turin: until 21 December 2037 |
| Post-Tariff Regime |
Friuli & Parma: Prezzi Minimi (minimum guaranteed tariff)Turin: Prezzi Minimi or direct marketing |