© 2026 MergersCorp M&A International.
© 2025 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities (“Members”) located throughout the world to provide Investment Banking, Corporate Finance, and Advisory Services and other client-related professional services. The Member Firms (“Members”) are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit our Disclaimer: https://mergerscorp.com/disclaimer. MergersCorp M&A International's franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited, a UK Company with its registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
MergersCorp M&A International provides strategic business advisory services, including preparing companies for growth and capital access. Through partnerships with licensed investment bankers, clients can access tailored capital-raising solutions.
U.S. Investment Banking Securities transactions are exclusively conducted by Spektrum Capital Advisors LLC, a Registered Representative of, and Securities Products offered through, BA Securities, LLC, a FINRA-registered broker-dealer. Check the background of investment professionals associated with this site on Broker Check.
The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation.
The platform combines titled and optioned land, access to substantial natural gas supply, and a site-specific Power Purchase Agreement (PPA) issued by CLS Sustainable, acting as an independent power producer (IPP).
The development strategy is designed to serve the rapidly growing demand for hyperscale data centers, artificial intelligence (AI) infrastructure and other energy-intensive applications, offering a phased route to multi-gigawatt power delivery without relying on ERCOT grid interconnection as the primary source of initial power.
Buyers may select two or three of the seven available sites to assemble the full 7 GW development platform, with the remaining sites potentially available for other development opportunities.
KEY INVESTMENT HIGHLIGHTS
SITE PORTFOLIO & DEVELOPMENT POTENTIAL
The Project Waha platform comprises seven development locations in the Permian Basin, offering flexibility in site selection and phased campus deployment.
| Site | Land Area (Acres) | Minimum Gas Availability (MMBtu/day) |
|---|---|---|
| Andrews | 1,760 | 200,000 |
| Archer 2 | 1,840 | 200,000 |
| Glasscock 1 | 930 | 200,000 |
| Glasscock 2 | 750 | 100,000 |
| MIP | 1,180 | 250,000 |
| Mendel | 640 | 100,000 |
| Midkiff | 2,650 | 300,000 |
| Total | 9,750 | 1,350,000 |
Archer 2 – Quintessa is identified as the reference site for the initial 1 GW development model, with the same development framework intended to be replicated across the selected locations.
The development can be implemented sequentially or simultaneously across multiple sites, providing flexibility in construction, power delivery and environmental permitting.
POWER & COMMERCIAL STRUCTURE
The platform is supported by a proposed behind-the-meter generation strategy under a Power Purchase Agreement issued by CLS Sustainable, acting as an independent power producer.
Key Commercial Terms:
| Item | Details |
|---|---|
| Power Provider / IPP | CLS Sustainable |
| Contracted Capacity | PPA issued against full 7 GW campus potential |
| Conversion Price | USD 0.10/kWh (USD 100/MWh) |
| Annual Escalator | 3% on conversion component |
| Fuel | Passed through at cost, without markup in conversion price |
| Tariffs & Taxes | Passed through |
The commercial structure separates the fixed power conversion component from fuel, tariff and tax expenses. The buyer is therefore exposed to the agreed conversion price and annual escalator, while commodity and applicable regulatory costs remain pass-through items.
The initial power strategy is based on on-site generation, with potential Oncor grid service serving as a supplementary bridge or redundancy option rather than the primary determinant of initial power delivery.
NATURAL GAS & GENERATION INFRASTRUCTURE
The project benefits from its strategic position at the Waha natural gas hub in the Permian Basin, with approximately 20 GW of gas supply availability reported across multiple suppliers.
Gas supply term sheets are reportedly in hand, with the following infrastructure development parameters:
The long-term energy strategy is based on scalable on-site generation, supported by the natural gas infrastructure and the proposed PPA structure.
PERMITTING & DEVELOPMENT SCHEDULE
Air permitting is expected to follow a phased strategy aligned with generation capacity.
Indicative Power Development Timeline
| Development Phase | Target Timing | Cumulative Capacity |
|---|---|---|
| First Block | Q2 2027 | 150 MW |
| Second Block | Q3 2027 | 300 MW |
| Third Block | Q4 2027 | 550 MW |
| Year 1 Target | 2027 | 1 GW |
| Year 2 Target | 2028 | 4 GW |
| Year 3 Target | 2029 | 7 GW |
The schedule represents the project’s stated development targets and remains subject to generation equipment procurement, gas infrastructure, permitting, construction and commissioning.
FIRST-PHASE DEVELOPMENT COSTS
Estimated owner-controllable development costs total approximately USD 117.5 million, excluding generation equipment.
| Workstream | Estimated Cost |
|---|---|
| Survey, ALTA, Title, Legal & Closing | USD 200,000 |
| Environmental & Site Assessments | USD 25,000 |
| Geotechnical & Materials Testing | USD 25,000 |
| TCEQ NSR / PSD Engineering | USD 25,000 |
| Title V Operating Permit Support | USD 250,000 |
| Water Rights, Testing, Treatment & Storage | USD 3,000,000 |
| Fiber Laterals & Redundant Connectivity | USD 25,000,000 |
| Gas Interconnection & Lateral Infrastructure | USD 25,000,000 |
| Substation Interconnection & Protection | USD 15,000,000 |
| Site Grading, Roads, Drainage & Security | USD 12,000,000 |
| Construction Power & Mobilization | USD 4,000,000 |
| EPC / Owner Engineering & Project Controls | USD 12,000,000 |
| Insurance, Bonding & Commissioning | USD 6,000,000 |
| Development Contingency | USD 15,000,000 |
| Total Estimated Development Costs | USD 117,525,000 |
Generation equipment costs are excluded from the above development budget.
INFRASTRUCTURE & UTILITIES
Power: Behind-the-meter generation platform targeting up to 7 GW under the proposed IPP / PPA structure, supported by reported natural gas availability.
Natural Gas: Access to approximately 20 GW of gas supply across multiple suppliers, with site-specific supply arrangements and gas lateral infrastructure under development.
Fiber Connectivity: Multiple regional and long-haul fiber routes identified across the portfolio, with route studies available in the respective site data rooms.
Water: Water availability documented on a site-specific basis, with identified infrastructure and development requirements.
Permitting & Substations: Site-specific documentation covering air permits, existing substation context and potential future grid interconnection options.
Expansion Infrastructure: Approximately 10,000 additional acres optioned to accommodate future gas laterals, water infrastructure, fiber connectivity and potential grid interconnection.
© 2025 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities (“Members”) located throughout the world to provide Investment Banking, Corporate Finance, and Advisory Services and other client-related professional services. The Member Firms (“Members”) are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit our Disclaimer: https://mergerscorp.com/disclaimer. MergersCorp M&A International's franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited, a UK Company with its registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
MergersCorp M&A International provides strategic business advisory services, including preparing companies for growth and capital access. Through partnerships with licensed investment bankers, clients can access tailored capital-raising solutions.
U.S. Investment Banking Securities transactions are exclusively conducted by Spektrum Capital Advisors LLC, a Registered Representative of, and Securities Products offered through, BA Securities, LLC, a FINRA-registered broker-dealer. Check the background of investment professionals associated with this site on Broker Check.
This website is operated by MergersUS Inc a US Corporation with registered office at





Description
The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation.
The platform combines titled and optioned land, access to substantial natural gas supply, and a site-specific Power Purchase Agreement (PPA) issued by CLS Sustainable, acting as an independent power producer (IPP).
The development strategy is designed to serve the rapidly growing demand for hyperscale data centers, artificial intelligence (AI) infrastructure and other energy-intensive applications, offering a phased route to multi-gigawatt power delivery without relying on ERCOT grid interconnection as the primary source of initial power.
Buyers may select two or three of the seven available sites to assemble the full 7 GW development platform, with the remaining sites potentially available for other development opportunities.
KEY INVESTMENT HIGHLIGHTS
SITE PORTFOLIO & DEVELOPMENT POTENTIAL
The Project Waha platform comprises seven development locations in the Permian Basin, offering flexibility in site selection and phased campus deployment.
Archer 2 – Quintessa is identified as the reference site for the initial 1 GW development model, with the same development framework intended to be replicated across the selected locations.
The development can be implemented sequentially or simultaneously across multiple sites, providing flexibility in construction, power delivery and environmental permitting.
POWER & COMMERCIAL STRUCTURE
The platform is supported by a proposed behind-the-meter generation strategy under a Power Purchase Agreement issued by CLS Sustainable, acting as an independent power producer.
Key Commercial Terms:
The commercial structure separates the fixed power conversion component from fuel, tariff and tax expenses. The buyer is therefore exposed to the agreed conversion price and annual escalator, while commodity and applicable regulatory costs remain pass-through items.
The initial power strategy is based on on-site generation, with potential Oncor grid service serving as a supplementary bridge or redundancy option rather than the primary determinant of initial power delivery.
NATURAL GAS & GENERATION INFRASTRUCTURE
The project benefits from its strategic position at the Waha natural gas hub in the Permian Basin, with approximately 20 GW of gas supply availability reported across multiple suppliers.
Gas supply term sheets are reportedly in hand, with the following infrastructure development parameters:
The long-term energy strategy is based on scalable on-site generation, supported by the natural gas infrastructure and the proposed PPA structure.
PERMITTING & DEVELOPMENT SCHEDULE
Air permitting is expected to follow a phased strategy aligned with generation capacity.
Indicative Power Development Timeline
The schedule represents the project’s stated development targets and remains subject to generation equipment procurement, gas infrastructure, permitting, construction and commissioning.
FIRST-PHASE DEVELOPMENT COSTS
Estimated owner-controllable development costs total approximately USD 117.5 million, excluding generation equipment.
Generation equipment costs are excluded from the above development budget.
INFRASTRUCTURE & UTILITIES
Power: Behind-the-meter generation platform targeting up to 7 GW under the proposed IPP / PPA structure, supported by reported natural gas availability.
Natural Gas: Access to approximately 20 GW of gas supply across multiple suppliers, with site-specific supply arrangements and gas lateral infrastructure under development.
Fiber Connectivity: Multiple regional and long-haul fiber routes identified across the portfolio, with route studies available in the respective site data rooms.
Water: Water availability documented on a site-specific basis, with identified infrastructure and development requirements.
Permitting & Substations: Site-specific documentation covering air permits, existing substation context and potential future grid interconnection options.
Expansion Infrastructure: Approximately 10,000 additional acres optioned to accommodate future gas laterals, water infrastructure, fiber connectivity and potential grid interconnection.
Basic Details
Target Price:
$ 0
Gross Revenue
TBD
EBITDA
TBD
Business ID:
L#20261216
Country
United States
Detail
Published on November 3, 2026 at 11:36 am. Updated on November 3, 2026 at 11:36 am