    7GW Hyperscale Data Center & Powered Land Development Platform

    Description

    L#20261216

    The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation.

    The platform combines titled and optioned land, access to substantial natural gas supply, and a site-specific Power Purchase Agreement (PPA) issued by CLS Sustainable, acting as an independent power producer (IPP).

    The development strategy is designed to serve the rapidly growing demand for hyperscale data centers, artificial intelligence (AI) infrastructure and other energy-intensive applications, offering a phased route to multi-gigawatt power delivery without relying on ERCOT grid interconnection as the primary source of initial power.

    Buyers may select two or three of the seven available sites to assemble the full 7 GW development platform, with the remaining sites potentially available for other development opportunities.

    KEY INVESTMENT HIGHLIGHTS

    • Total Power Platform: Up to 7 GW of proposed behind-the-meter generation capacity.
    • Portfolio: Seven secured development sites across the Waha hub region.
    • Land Area: Approximately 9,750 acres across the seven sites.
    • Additional Land: Approximately 10,000 acres optioned for future infrastructure and expansion.
    • Power Purchase Agreement: Site-specific PPA issued by CLS Sustainable.
    • Indicative Power Price: USD 0.10/kWh (USD 100/MWh), plus a 3% annual escalator on the conversion component.
    • Natural Gas Supply: Approximately 20 GW of gas supply availability reported across multiple suppliers.
    • Initial Power Delivery: 150 MW targeted for Q2 2027.
    • Development Schedule: Targeting 1 GW in 2027, 4 GW cumulative by 2028 and 7 GW by 2029.
    • Infrastructure: Existing regional gas and fiber corridors, with water, permitting and substation information available in individual site data rooms.

    SITE PORTFOLIO & DEVELOPMENT POTENTIAL

    The Project Waha platform comprises seven development locations in the Permian Basin, offering flexibility in site selection and phased campus deployment.

    Site Land Area (Acres) Minimum Gas Availability (MMBtu/day)
    Andrews 1,760 200,000
    Archer 2 1,840 200,000
    Glasscock 1 930 200,000
    Glasscock 2 750 100,000
    MIP 1,180 250,000
    Mendel 640 100,000
    Midkiff 2,650 300,000
    Total 9,750 1,350,000

    Archer 2 – Quintessa is identified as the reference site for the initial 1 GW development model, with the same development framework intended to be replicated across the selected locations.

    The development can be implemented sequentially or simultaneously across multiple sites, providing flexibility in construction, power delivery and environmental permitting.

    POWER & COMMERCIAL STRUCTURE

    The platform is supported by a proposed behind-the-meter generation strategy under a Power Purchase Agreement issued by CLS Sustainable, acting as an independent power producer.

    Key Commercial Terms:

    Item Details
    Power Provider / IPP CLS Sustainable
    Contracted Capacity PPA issued against full 7 GW campus potential
    Conversion Price USD 0.10/kWh (USD 100/MWh)
    Annual Escalator 3% on conversion component
    Fuel Passed through at cost, without markup in conversion price
    Tariffs & Taxes Passed through

    The commercial structure separates the fixed power conversion component from fuel, tariff and tax expenses. The buyer is therefore exposed to the agreed conversion price and annual escalator, while commodity and applicable regulatory costs remain pass-through items.

    The initial power strategy is based on on-site generation, with potential Oncor grid service serving as a supplementary bridge or redundancy option rather than the primary determinant of initial power delivery.

    NATURAL GAS & GENERATION INFRASTRUCTURE

    The project benefits from its strategic position at the Waha natural gas hub in the Permian Basin, with approximately 20 GW of gas supply availability reported across multiple suppliers.

    Gas supply term sheets are reportedly in hand, with the following infrastructure development parameters:

    • Initial 150 MW Supply: Targeted to be available in less than six months.
    • Gas Interconnection: Approximately USD 25 million in estimated development costs.
    • Development Timeline: Approximately 6–9 months for gigawatt-capable interconnection, metering, regulation and lateral infrastructure.
    • Midstream Partner: Revolution Midstream is the contemplated counterpart for building, owning, operating, transporting and metering the gas lateral.

    The long-term energy strategy is based on scalable on-site generation, supported by the natural gas infrastructure and the proposed PPA structure.

    PERMITTING & DEVELOPMENT SCHEDULE

    Air permitting is expected to follow a phased strategy aligned with generation capacity.

    • Initial Phase: TCEQ standard-permit pathway indicated for projects at or below approximately 300 MW, with a 45–60-day feasibility period.
    • Full 1 GW Development: Title V / Prevention of Significant Deterioration (PSD) permitting, with an estimated 9–15-month process involving emissions modeling and public notice.

    Indicative Power Development Timeline

    Development Phase Target Timing Cumulative Capacity
    First Block Q2 2027 150 MW
    Second Block Q3 2027 300 MW
    Third Block Q4 2027 550 MW
    Year 1 Target 2027 1 GW
    Year 2 Target 2028 4 GW
    Year 3 Target 2029 7 GW

    The schedule represents the project’s stated development targets and remains subject to generation equipment procurement, gas infrastructure, permitting, construction and commissioning.

    FIRST-PHASE DEVELOPMENT COSTS

    Estimated owner-controllable development costs total approximately USD 117.5 million, excluding generation equipment.

    Workstream Estimated Cost
    Survey, ALTA, Title, Legal & Closing USD 200,000
    Environmental & Site Assessments USD 25,000
    Geotechnical & Materials Testing USD 25,000
    TCEQ NSR / PSD Engineering USD 25,000
    Title V Operating Permit Support USD 250,000
    Water Rights, Testing, Treatment & Storage USD 3,000,000
    Fiber Laterals & Redundant Connectivity USD 25,000,000
    Gas Interconnection & Lateral Infrastructure USD 25,000,000
    Substation Interconnection & Protection USD 15,000,000
    Site Grading, Roads, Drainage & Security USD 12,000,000
    Construction Power & Mobilization USD 4,000,000
    EPC / Owner Engineering & Project Controls USD 12,000,000
    Insurance, Bonding & Commissioning USD 6,000,000
    Development Contingency USD 15,000,000
    Total Estimated Development Costs USD 117,525,000

    Generation equipment costs are excluded from the above development budget.

    INFRASTRUCTURE & UTILITIES

    Power: Behind-the-meter generation platform targeting up to 7 GW under the proposed IPP / PPA structure, supported by reported natural gas availability.

    Natural Gas: Access to approximately 20 GW of gas supply across multiple suppliers, with site-specific supply arrangements and gas lateral infrastructure under development.

    Fiber Connectivity: Multiple regional and long-haul fiber routes identified across the portfolio, with route studies available in the respective site data rooms.

    Water: Water availability documented on a site-specific basis, with identified infrastructure and development requirements.

    Permitting & Substations: Site-specific documentation covering air permits, existing substation context and potential future grid interconnection options.

    Expansion Infrastructure: Approximately 10,000 additional acres optioned to accommodate future gas laterals, water infrastructure, fiber connectivity and potential grid interconnection.

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261216

    Country

    United States

    Detail

    Business ID:L#20261216
    Property Type:Data Centers
    Property Status:For Sale
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on November 3, 2026 at 11:36 am. Updated on November 3, 2026 at 11:36 am

      The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation.

      The platform combines titled and optioned land, access to substantial natural gas supply, and a site-specific Power Purchase Agreement (PPA) issued by CLS Sustainable, acting as an independent power producer (IPP).

      The development strategy is designed to serve the rapidly growing demand for hyperscale data centers, artificial intelligence (AI) infrastructure and other energy-intensive applications, offering a phased route to multi-gigawatt power delivery without relying on ERCOT grid interconnection as the primary source of initial power.

      Buyers may select two or three of the seven available sites to assemble the full 7 GW development platform, with the remaining sites potentially available for other development opportunities.

      KEY INVESTMENT HIGHLIGHTS

      SITE PORTFOLIO & DEVELOPMENT POTENTIAL

      The Project Waha platform comprises seven development locations in the Permian Basin, offering flexibility in site selection and phased campus deployment.

      Site Land Area (Acres) Minimum Gas Availability (MMBtu/day)
      Andrews 1,760 200,000
      Archer 2 1,840 200,000
      Glasscock 1 930 200,000
      Glasscock 2 750 100,000
      MIP 1,180 250,000
      Mendel 640 100,000
      Midkiff 2,650 300,000
      Total 9,750 1,350,000

      Archer 2 – Quintessa is identified as the reference site for the initial 1 GW development model, with the same development framework intended to be replicated across the selected locations.

      The development can be implemented sequentially or simultaneously across multiple sites, providing flexibility in construction, power delivery and environmental permitting.

      POWER & COMMERCIAL STRUCTURE

      The platform is supported by a proposed behind-the-meter generation strategy under a Power Purchase Agreement issued by CLS Sustainable, acting as an independent power producer.

      Key Commercial Terms:

      Item Details
      Power Provider / IPP CLS Sustainable
      Contracted Capacity PPA issued against full 7 GW campus potential
      Conversion Price USD 0.10/kWh (USD 100/MWh)
      Annual Escalator 3% on conversion component
      Fuel Passed through at cost, without markup in conversion price
      Tariffs & Taxes Passed through

      The commercial structure separates the fixed power conversion component from fuel, tariff and tax expenses. The buyer is therefore exposed to the agreed conversion price and annual escalator, while commodity and applicable regulatory costs remain pass-through items.

      The initial power strategy is based on on-site generation, with potential Oncor grid service serving as a supplementary bridge or redundancy option rather than the primary determinant of initial power delivery.

      NATURAL GAS & GENERATION INFRASTRUCTURE

      The project benefits from its strategic position at the Waha natural gas hub in the Permian Basin, with approximately 20 GW of gas supply availability reported across multiple suppliers.

      Gas supply term sheets are reportedly in hand, with the following infrastructure development parameters:

      The long-term energy strategy is based on scalable on-site generation, supported by the natural gas infrastructure and the proposed PPA structure.

      PERMITTING & DEVELOPMENT SCHEDULE

      Air permitting is expected to follow a phased strategy aligned with generation capacity.

      Indicative Power Development Timeline

      Development Phase Target Timing Cumulative Capacity
      First Block Q2 2027 150 MW
      Second Block Q3 2027 300 MW
      Third Block Q4 2027 550 MW
      Year 1 Target 2027 1 GW
      Year 2 Target 2028 4 GW
      Year 3 Target 2029 7 GW

      The schedule represents the project’s stated development targets and remains subject to generation equipment procurement, gas infrastructure, permitting, construction and commissioning.

      FIRST-PHASE DEVELOPMENT COSTS

      Estimated owner-controllable development costs total approximately USD 117.5 million, excluding generation equipment.

      Workstream Estimated Cost
      Survey, ALTA, Title, Legal & Closing USD 200,000
      Environmental & Site Assessments USD 25,000
      Geotechnical & Materials Testing USD 25,000
      TCEQ NSR / PSD Engineering USD 25,000
      Title V Operating Permit Support USD 250,000
      Water Rights, Testing, Treatment & Storage USD 3,000,000
      Fiber Laterals & Redundant Connectivity USD 25,000,000
      Gas Interconnection & Lateral Infrastructure USD 25,000,000
      Substation Interconnection & Protection USD 15,000,000
      Site Grading, Roads, Drainage & Security USD 12,000,000
      Construction Power & Mobilization USD 4,000,000
      EPC / Owner Engineering & Project Controls USD 12,000,000
      Insurance, Bonding & Commissioning USD 6,000,000
      Development Contingency USD 15,000,000
      Total Estimated Development Costs USD 117,525,000

      Generation equipment costs are excluded from the above development budget.

      INFRASTRUCTURE & UTILITIES

      Power: Behind-the-meter generation platform targeting up to 7 GW under the proposed IPP / PPA structure, supported by reported natural gas availability.

      Natural Gas: Access to approximately 20 GW of gas supply across multiple suppliers, with site-specific supply arrangements and gas lateral infrastructure under development.

      Fiber Connectivity: Multiple regional and long-haul fiber routes identified across the portfolio, with route studies available in the respective site data rooms.

      Water: Water availability documented on a site-specific basis, with identified infrastructure and development requirements.

      Permitting & Substations: Site-specific documentation covering air permits, existing substation context and potential future grid interconnection options.

      Expansion Infrastructure: Approximately 10,000 additional acres optioned to accommodate future gas laterals, water infrastructure, fiber connectivity and potential grid interconnection.