This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300mln ton accumulated from 40 yrs of operation

Resource Analysis

  • Wardell Armstrong (MRI, PCR) 2020
  • During2015-2016 ,the Company undertook exploration:
  • Reverse circulation(RC)drilling–47holes
  • SurfacePitting–141
  • ToePitting–26
  • more than 900 ore samples
Name of Stockpile Category Volume (,000 m³) Density (t/m³) Tonnage (kt) Cu grade (%) Contained Copper (Kt)

XXXXX

 

(sulphide)

$C_1$ 1,004.8 3.41 3,426.3 0.23 7.9
$C_2$ 576.7 3.41 1,966.6 0.45 8.8

XXXXX

 

(Oxide ore)

C1 162.9 3.40 553.9 0.54 3.0

XXXXX 1

 

(Overburden)

C1 83,162.9 2.27 188,780 0.154 290.3

XXXXX

 

(Overburden)

C1 4,119.8 2.27 9,352 0.097 9.1

XXXXX

 

(Overburden)

$C_1$ 50,170.2 2.25 112,882.9 0.069 78.3
TOTAL 139,197.2 316,961.7 0.125 397.4

SX-EW plant Results

  • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
  • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
  • Over 36 tons of cathode copper sold on the local market at near LME prices.
  • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
  • 400 m access road to the site — completed
  • 1.1 km water pipeline fo the site — completed
  • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
  • 1 km of piping for the heap irrigation — purchased, connected and laid out
  • Ponds and collection trenches — completed and lined with geomembrane

SX-EW Business Model

  • Planned annual production: 10,000 tons of LME grade “A” cathode copper
  • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.
  • Key production cost drivers:
  1. Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
  2. Labor and Production Overheads (fixed)
  •  Mineral Extraction Tax @ 5.7% on value of copper in PLS
  •  Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract