web analytics
Contact M&A Advisor








    120-MWp Solar PV Photovoltaic Farm in Bosnia (RTB)

    Description

    L#20261046

    The Bosnia 120 MW Solar PV Project is a mid-scale renewable energy development designed to deliver reliable clean electricity to the national grid. With all key permitting secured and grid access in place, the project is in its final pre-construction stage, fully prepared for capital deployment and immediate construction readiness.

    Key Project Highlights

    • Installed Capacity: 120 MWp
    • Expected Annual Generation: 213,600 MWh
    • Yield Factor: 1,780 kWh per kWp installed
    • Grid Connection: Approved and secured 110 kV transmission line (all legal arrangements completed)
    • Land & Permits: All required permits obtained (environmental, land-use, construction)
    • Project Status: Advanced development stage – ready for construction

    Financial Overview

    • Total Project CAPEX: €106 million
    • Annual OPEX: €1.46 million
    • Revenue Potential: At €62/MWh tariff, projected annual revenue of ~€15.5 million
    • Average Annual Net Cash Flow: ~€14 million
    • Equity IRR: 17%
    • Equity Payback Period: 5.2 years
    • NPV (12% discount rate): €12 million
    • Levelized Cost of Energy (LCOE): €30/MWh
    • Financing: Senior debt financing has been successfully secured and ratified via banking institutions.

    Market & Investment Potential

    Bosnia’s national energy strategy prioritizes strong expansion of renewable energy capacity, with a particular focus on solar power to reduce dependence on energy imports. This project is fully aligned with national decarbonization objectives and benefits from low development risk, given its fully secured permits and grid connection.

    It represents a stable, long-term infrastructure investment, offering attractive risk-adjusted returns within an improving regulatory and energy market environment.

    Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.

    Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.

    Disclaimer

    All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.

    Financial Forecast

    Financial / Technical Parameter Value / Detail
    Listing Status / Location Ready-to-Build (RTB) / Bosnia
    Target Asking Price $11,500,000 USD
    Installed Capacity 120 MWp
    Estimated Total CAPEX ~€84,000,000 – €90,000,000 EUR (~€0.70M–€0.75M per MW benchmark)
    Expected Annual Generation ~180,000 MWh (Yield Factor: ~1,500 kWh/kWp)
    Assumed Power Tariff ~€66 / MWh
    Estimated Annual Gross Revenue ~€11,880,000 EUR
    Estimated Annual OPEX ~€1,250,000 EUR (O&M, land leases, insurance, administration)
    Estimated Annual EBITDA ~€10,630,000 EUR (Revenue minus OPEX)
    Implied EBITDA Margin ~89.5%

    Basic Details

    Target Price:

    $ 20,000,000

    Gross Revenue

    $11,880,000

    EBITDA

    $10,630,000

    Business ID:

    L#20261046

    Country

    Bosnia

    Detail

    Business ID:L#20261046
    Property Type:Renewable Energy - Solar PV
    Property Status:For Sale
    Target Price: $ 20,000,000
    Gross Revenue:$ 11,880,000
    EBITDA:$ 10,630,000
    Target Price / Revenue:1.68x
    Target Price / EBITDA:1.88x
    Contact M&A Advisor








      Published on May 5, 2026 at 12:10 pm. Updated on August 10, 2026 at 8:02 am

      The Bosnia 120 MW Solar PV Project is a mid-scale renewable energy development designed to deliver reliable clean electricity to the national grid. With all key permitting secured and grid access in place, the project is in its final pre-construction stage, fully prepared for capital deployment and immediate construction readiness.

      Key Project Highlights

      Financial Overview

      Market & Investment Potential

      Bosnia’s national energy strategy prioritizes strong expansion of renewable energy capacity, with a particular focus on solar power to reduce dependence on energy imports. This project is fully aligned with national decarbonization objectives and benefits from low development risk, given its fully secured permits and grid connection.

      It represents a stable, long-term infrastructure investment, offering attractive risk-adjusted returns within an improving regulatory and energy market environment.

      Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.

      Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.

      Disclaimer

      All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.

      Financial Forecast

      Financial / Technical Parameter Value / Detail
      Listing Status / Location Ready-to-Build (RTB) / Bosnia
      Target Asking Price $11,500,000 USD
      Installed Capacity 120 MWp
      Estimated Total CAPEX ~€84,000,000 – €90,000,000 EUR (~€0.70M–€0.75M per MW benchmark)
      Expected Annual Generation ~180,000 MWh (Yield Factor: ~1,500 kWh/kWp)
      Assumed Power Tariff ~€66 / MWh
      Estimated Annual Gross Revenue ~€11,880,000 EUR
      Estimated Annual OPEX ~€1,250,000 EUR (O&M, land leases, insurance, administration)
      Estimated Annual EBITDA ~€10,630,000 EUR (Revenue minus OPEX)
      Implied EBITDA Margin ~89.5%

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1