    12.73MW Agrivoltaic Solar Project

    Description

    L#20261228

    A 12.73 MWp agrivoltaic solar photovoltaic project located in the Lazio region of central Italy. The project covers approximately 20.32 hectares and is designed to combine renewable electricity generation with continued agricultural land use. Its technical configuration achieves a Land Occupation Ratio (LAOR) of 38.27%, remaining below the applicable 40% threshold. The project has reached a significant permitting milestone, with the simplified authorization procedure (PAS) completed through the administrative silence-assent mechanism, according to the documentation provided.

    KEY PROJECT HIGHLIGHTS

    • Installed Capacity: 12.73 MWp
    • Total Land Area: Approximately 20.32 hectares
    • Area Occupied by PV Modules: Approximately 14.30 hectares
    • Land Occupation Ratio (LAOR): 38.27%
    • Specific Energy Yield: 1.40 GWh/ha/year
    • Grid Connection Allocation: Approximately €14,130 (excluding VAT)
    • Technology: Agrivoltaic solar PV

    TECHNICAL OVERVIEW

    The project features an agrivoltaic configuration designed to optimize land utilization while maintaining agricultural compatibility.

    Key technical parameters include:

    • LAOR of 38.27%, below the 40% threshold indicated in the project documentation.
    • Specific energy yield of 1.40 GWh/ha/year, compared with the 1.07 GWh/ha/year agrivoltaic reference benchmark provided.
    • Compliance with the specified minimum agrivoltaic-to-standard photovoltaic productivity ratio of 0.60.

    GRID CONNECTION

    The project benefits from an allocated grid-connection cost based on the applicable Terna transmission network estimate.

    • Total Standard Terna Grid Works Estimate: €450,000
    • Project Allocation Coefficient: 3.14%
    • Allocated Grid Connection Contribution: Approximately €14,130, excluding VAT
    • Connection Configuration: Connection via a new 150 kV electrical substation and associated connection infrastructure.

    The proposed grid infrastructure includes a new 150 kV electrical substation and connection works associated with the existing transmission network.

    PERMITTING & DEVELOPMENT STATUS

    The project has progressed through the principal milestone of its simplified authorization procedure (PAS).

    Milestone Status / Timeline
    PAS application submitted 11 September 2026
    Authorization perfected through silence-assent procedure 21 October 2026
    Publication in the Official Bulletin of the Lazio Region Scheduled for 5 November 2026
    Deadline to commence construction Within 18 months, subject to applicable TICA provisions and relevant contractual conditions
    New 150 kV electrical substation Estimated construction period: 16 months
    Grid connection works Estimated 8 months + 1 month per km

    INVESTMENT RATIONALE

    • Advanced permitting: The PAS procedure has reportedly reached completion through the silence-assent mechanism.
    • Attractive project scale: 12.73 MWp of planned installed capacity.
    • Agrivoltaic land-use efficiency: LAOR of 38.27%, within the stated regulatory threshold.
    • Strong technical productivity: Project-specific energy yield of 1.40 GWh/ha/year.
    • Grid infrastructure planning: Defined connection configuration and allocated grid-connection contribution.
    • Strategic location: Situated in the Lazio region, Italy, within the country’s established renewable energy market.

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261228

    Country

    Italy

    Detail

    Business ID:L#20261228
    Property Type:Renewable Energy - Solar PV
    Property Status:For Sale
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on November 4, 2026 at 6:03 pm. Updated on November 4, 2026 at 6:08 pm

      A 12.73 MWp agrivoltaic solar photovoltaic project located in the Lazio region of central Italy. The project covers approximately 20.32 hectares and is designed to combine renewable electricity generation with continued agricultural land use. Its technical configuration achieves a Land Occupation Ratio (LAOR) of 38.27%, remaining below the applicable 40% threshold. The project has reached a significant permitting milestone, with the simplified authorization procedure (PAS) completed through the administrative silence-assent mechanism, according to the documentation provided.

      KEY PROJECT HIGHLIGHTS

      TECHNICAL OVERVIEW

      The project features an agrivoltaic configuration designed to optimize land utilization while maintaining agricultural compatibility.

      Key technical parameters include:

      GRID CONNECTION

      The project benefits from an allocated grid-connection cost based on the applicable Terna transmission network estimate.

      The proposed grid infrastructure includes a new 150 kV electrical substation and connection works associated with the existing transmission network.

      PERMITTING & DEVELOPMENT STATUS

      The project has progressed through the principal milestone of its simplified authorization procedure (PAS).

      Milestone Status / Timeline
      PAS application submitted 11 September 2026
      Authorization perfected through silence-assent procedure 21 October 2026
      Publication in the Official Bulletin of the Lazio Region Scheduled for 5 November 2026
      Deadline to commence construction Within 18 months, subject to applicable TICA provisions and relevant contractual conditions
      New 150 kV electrical substation Estimated construction period: 16 months
      Grid connection works Estimated 8 months + 1 month per km