    10.2 MW Agrivoltaic Solar Project with Tracker Technology

    Description

    L#20261189

    The Project has a grid injection capacity of 10.2 MW and a current design of c. 12.7 MWp, using bifacial modules on single-axis trackers combined with continued agricultural use of the land.

    The Project is being authorised through the Simplified Authorisation Procedure (PAS) at municipal level: the application was filed with the municipal One-Stop Shop (SUAP) in July 2026 and the supplementary town-planning documentation requested by the municipality was submitted in September 2026. The grid connection solution issued by Terna provides for a 150 kV antenna connection to a new switching substation of the national transmission grid. The opportunity suits IPPs, infrastructure and energy-transition funds and industrial investors seeking a mid-size, advanced-stage Italian solar asset.

    INVESTMENT HIGHLIGHTS

    • Efficient permitting route: PAS is a simplified municipal procedure; the SUAP receipt (August 2026) sets a 30-day term after which silence of the competent administration is equivalent to approval. The supplementary documentation requested in September 2026 has already been filed.
    • Direct HV grid access: Terna connection solution (STMG) with a 150 kV underground cable in antenna to a new 150 kV RTN switching substation, inserted in-out on an existing 150 kV line; dedicated 30/150 kV user substation within the site.
    • High-yield technology: single-axis E-W trackers with 650 Wp bifacial N-type modules and SMA central inverters, in one of Italy’s stronger solar-resource regions.
    • Secured, simple land base: the plant sits on a single cadastral parcel with one owner, under a preliminary purchase agreement; the cable route crosses only a few private parcels (easements) and farm roads, with modest estimated compensation.
    • Mature engineering: electrical design report with cable sizing and electromagnetic-field assessment (March 2026), detailed expropriation/easement parcel plan (July 2026) and a full PAS design package (landscape, constraints and planning studies).
    • Supportive market: Italy’s National Energy and Climate Plan (PNIEC) targets c. 80 GW of installed solar PV by 2030; agrivoltaic layouts are favoured by Italian energy and land-use policy.

    KEY PROJECT DATA

    Location Lazio region, Central Italy (province north of Rome); agricultural area at c. 160 m above sea level, reached via a farm road off a state road
    Technology Agrivoltaic, ground-mounted; single-axis E-W trackers (N-S axis); bifacial monocrystalline N-type modules (650 Wp)
    Capacity 10.2 MW grid injection; 12.727 MWp DC (rated capacity 10.67 MW per the parcel plan)
    Main equipment (current design) 19,580 modules; 3 SMA Sunny Central UP central inverters (2 × 3,060 kVA + 1 × 4,200 kVA) in MV power stations; 30 kV MV network; 30/150 kV user substation
    Site Single cadastral parcel of c. 17.3 ha project area (c. 14.3 ha occupied by the plant, including mitigation areas, roads and fencing); currently cereals and forage, to be replaced by crops defined in an agronomic plan
    Grid connection Terna STMG: 150 kV underground cable in antenna to a new 150 kV RTN switching substation, inserted in-out on an existing 150 kV line
    Land rights Plant parcel: preliminary purchase agreement with the sole owner. Cable route: easements over c. 5 private parcels (c. 1.2 km, c. 2,500 m² of easement strip; estimated compensation c. €2k) plus farm roads
    Permitting route Simplified Authorisation Procedure (PAS) – municipal SUAP/SUE
    Incentives Route to market through merchant sales and/or PPA (eligibility for support schemes to be assessed by the buyer)

    DEVELOPMENT STATUS & MILESTONES

    March 2026 Electrical design and electromagnetic-field report completed
    July 2026 PAS application filed with the municipal One-Stop Shop (SUAP); parcel plan issued
    August 2026 SUAP receipt issued (30-day term for silent consent)
    September 2026 Municipality requests re-filing of the town-planning documents on its building portal (SUE) within 60 days; supplementary documentation submitted on 11 September 2026

    Note: the outcome of the PAS procedure and the status of the grid connection solution (acceptance and validity) will be confirmed in the data room.

    INDICATIVE ECONOMICS

    Illustrative specific yield c. 1,750–1,850 kWh/kWp (single-axis trackers with bifacial modules in Central Italy)
    Illustrative annual production c. 22–23.5 GWh (year 1)
    Illustrative annual revenue c. €1.7–2.0m at an assumed captured price of €75–85/MWh
    CAPEX / energy yield report Not included in the documentation received; to be provided in the data room

    No energy yield report or cost estimate was provided with the project documents. The figures above are MergersCorp benchmark assumptions for indicative purposes only and are not forecasts.

    PROPOSED TRANSACTION & PROCESS

    • Perimeter: acquisition of 100% of the project company holding the Project’s rights, applications, Terna grid connection solution and land agreements.
    • Structure: share deal (to be confirmed); consideration and payment terms to be proposed by bidders.
    • Next steps: execution of a Non-Disclosure Agreement, followed by access to an Information Memorandum and virtual data room, and submission of non-binding indications of interest.

    Basic Details

    Target Price:

    EUR 0

    Gross Revenue

    €1,700,000

    EBITDA

    TBD

    Business ID:

    L#20261189

    Country

    Italy

    Detail

    Business ID:L#20261189
    Property Type:Renewable Energy - Solar PV, Renewable Energy
    Property Status:For Sale
    Target Price: EUR 0
    Gross Revenue:EUR 1,700,000
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on October 9, 2026 at 11:05 am. Updated on October 9, 2026 at 12:58 pm

      The Project has a grid injection capacity of 10.2 MW and a current design of c. 12.7 MWp, using bifacial modules on single-axis trackers combined with continued agricultural use of the land.

      The Project is being authorised through the Simplified Authorisation Procedure (PAS) at municipal level: the application was filed with the municipal One-Stop Shop (SUAP) in July 2026 and the supplementary town-planning documentation requested by the municipality was submitted in September 2026. The grid connection solution issued by Terna provides for a 150 kV antenna connection to a new switching substation of the national transmission grid. The opportunity suits IPPs, infrastructure and energy-transition funds and industrial investors seeking a mid-size, advanced-stage Italian solar asset.

      INVESTMENT HIGHLIGHTS

      KEY PROJECT DATA

      Location Lazio region, Central Italy (province north of Rome); agricultural area at c. 160 m above sea level, reached via a farm road off a state road
      Technology Agrivoltaic, ground-mounted; single-axis E-W trackers (N-S axis); bifacial monocrystalline N-type modules (650 Wp)
      Capacity 10.2 MW grid injection; 12.727 MWp DC (rated capacity 10.67 MW per the parcel plan)
      Main equipment (current design) 19,580 modules; 3 SMA Sunny Central UP central inverters (2 × 3,060 kVA + 1 × 4,200 kVA) in MV power stations; 30 kV MV network; 30/150 kV user substation
      Site Single cadastral parcel of c. 17.3 ha project area (c. 14.3 ha occupied by the plant, including mitigation areas, roads and fencing); currently cereals and forage, to be replaced by crops defined in an agronomic plan
      Grid connection Terna STMG: 150 kV underground cable in antenna to a new 150 kV RTN switching substation, inserted in-out on an existing 150 kV line
      Land rights Plant parcel: preliminary purchase agreement with the sole owner. Cable route: easements over c. 5 private parcels (c. 1.2 km, c. 2,500 m² of easement strip; estimated compensation c. €2k) plus farm roads
      Permitting route Simplified Authorisation Procedure (PAS) – municipal SUAP/SUE
      Incentives Route to market through merchant sales and/or PPA (eligibility for support schemes to be assessed by the buyer)

      DEVELOPMENT STATUS & MILESTONES

      March 2026 Electrical design and electromagnetic-field report completed
      July 2026 PAS application filed with the municipal One-Stop Shop (SUAP); parcel plan issued
      August 2026 SUAP receipt issued (30-day term for silent consent)
      September 2026 Municipality requests re-filing of the town-planning documents on its building portal (SUE) within 60 days; supplementary documentation submitted on 11 September 2026

      Note: the outcome of the PAS procedure and the status of the grid connection solution (acceptance and validity) will be confirmed in the data room.

      INDICATIVE ECONOMICS

      Illustrative specific yield c. 1,750–1,850 kWh/kWp (single-axis trackers with bifacial modules in Central Italy)
      Illustrative annual production c. 22–23.5 GWh (year 1)
      Illustrative annual revenue c. €1.7–2.0m at an assumed captured price of €75–85/MWh
      CAPEX / energy yield report Not included in the documentation received; to be provided in the data room

      No energy yield report or cost estimate was provided with the project documents. The figures above are MergersCorp benchmark assumptions for indicative purposes only and are not forecasts.

      PROPOSED TRANSACTION & PROCESS

      MergersCorp M&A