    Swiss Datacenter Development Field [RTB 2030]

    Description

    L#20261170

    Switzerland has established itself as one of Europe’s premier Tier-2 data centre markets, positioned directly behind the FLAPD tier (Frankfurt, London, Amsterdam, Paris, and Dublin). Underpinned by long-term geopolitical stability, strict data sovereignty regulations, and an energy grid dominated by low-carbon sources (hydroelectric and nuclear), the country serves as a strategic digital bastion for international hyperscalers, global financial institutions, and enterprise enterprises.

    The greater Zurich metropolitan area accounts for roughly 60% of Switzerland’s installed IT load, serving as the central exchange point for telecommunications, cloud availability zones, and banking backbones.

    As core urban centers face increasing power transmission bottlenecks and limited land availability, development has steadily shifted toward well-connected, peri-urban industrial corridors that provide direct high-voltage connectivity.

    This opportunity represents a prime 5-10 hectare hyperscale data centre development opportunity situated in Switzerland. The site benefits from outright freehold ownership, industrial zoning, immediate proximity to the national 225 kV transmission grid, and access to high-capacity fibre corridors.

    Key Metric Details
    Total Campus Size 5-10 ha
    Plot Breakdown
    • Plot A + Plot B
    Total Committed Power 100 MW committed by regional utility EKZ
    Zoning Industrial Zone IV (highest industrial classification in Swiss; permits data centres as-of-right)
    Tenure Freehold (plain propriety) with clean, unencumbered title

    Environmental & Geotechnical: Site assessments show no material contamination or abnormal conditions. Full baseline reports transfer with the transaction.

    Hydrology & Topography: Designated Flood Zone 1 (lowest risk category), requiring only standard drainage infrastructure. The site features flat terrain with standard grading requirements.

    Clear Regulatory Runway: No zoning amendments required.

    Strong municipal and utility alignment: building permit turnaround is projected at approximately 12 months post-submission of a conforming application.

    Notice: Buy-Side Opportunity & Fee Requirement

    This opportunity is presented strictly on a buy-side basis. Any prospective buyer, investor, or representative requesting detailed confidential information or an introduction to the target company will be required to execute a non-disclosure agreement (NDA) and a standard Buy-Side Fee Agreement with [Your Company / Broker Name] prior to receiving access to materials or initiating discussions.

    Basic Details

    Target Price:

    CHF 125,000,000

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261170

    Country

    Switzerland

    Detail

    Business ID:L#20261170
    Property Type:Data Centers
    Property Status:For Sale
    Target Price: CHF 125,000,000
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:125000000x
    Target Price / EBITDA:125000000x
    Contact M&A Advisor








      Published on September 20, 2026 at 7:18 pm. Updated on September 20, 2026 at 7:41 pm

      Switzerland has established itself as one of Europe’s premier Tier-2 data centre markets, positioned directly behind the FLAPD tier (Frankfurt, London, Amsterdam, Paris, and Dublin). Underpinned by long-term geopolitical stability, strict data sovereignty regulations, and an energy grid dominated by low-carbon sources (hydroelectric and nuclear), the country serves as a strategic digital bastion for international hyperscalers, global financial institutions, and enterprise enterprises.

      The greater Zurich metropolitan area accounts for roughly 60% of Switzerland’s installed IT load, serving as the central exchange point for telecommunications, cloud availability zones, and banking backbones.

      As core urban centers face increasing power transmission bottlenecks and limited land availability, development has steadily shifted toward well-connected, peri-urban industrial corridors that provide direct high-voltage connectivity.

      This opportunity represents a prime 5-10 hectare hyperscale data centre development opportunity situated in Switzerland. The site benefits from outright freehold ownership, industrial zoning, immediate proximity to the national 225 kV transmission grid, and access to high-capacity fibre corridors.

      Key Metric Details
      Total Campus Size 5-10 ha
      Plot Breakdown
      • Plot A + Plot B
      Total Committed Power 100 MW committed by regional utility EKZ
      Zoning Industrial Zone IV (highest industrial classification in Swiss; permits data centres as-of-right)
      Tenure Freehold (plain propriety) with clean, unencumbered title

      Environmental & Geotechnical: Site assessments show no material contamination or abnormal conditions. Full baseline reports transfer with the transaction.

      Hydrology & Topography: Designated Flood Zone 1 (lowest risk category), requiring only standard drainage infrastructure. The site features flat terrain with standard grading requirements.

      Clear Regulatory Runway: No zoning amendments required.

      Strong municipal and utility alignment: building permit turnaround is projected at approximately 12 months post-submission of a conforming application.

      Notice: Buy-Side Opportunity & Fee Requirement

      This opportunity is presented strictly on a buy-side basis. Any prospective buyer, investor, or representative requesting detailed confidential information or an introduction to the target company will be required to execute a non-disclosure agreement (NDA) and a standard Buy-Side Fee Agreement with [Your Company / Broker Name] prior to receiving access to materials or initiating discussions.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1