web analytics

Properties

A large-scale storage hydropower development opportunity located in a hydrologically rich South Asian river basin. The project is a fully engineered, high-head scheme designed for long-term baseload renewable energy generation with strong regional export potential.

Project Overview

The project is a storage-based hydropower scheme featuring a major RCC dam and a large reservoir system providing significant active storage capacity. The design enables multi-season regulation and optimized generation during peak demand periods.

  • Installed Capacity: 417 MW
  • Turbine Configuration: 4 × 104.25 MW vertical-axis Pelton units
  • Design Net Head: ~610 m
  • Design Discharge: 78.4 m³/s
  • Project Type: Storage Hydropower (High Head)
  • Status: Ready to Build Project

Dam & Reservoir

A major curved gravity RCC dam forms a large reservoir system with substantial storage enabling seasonal regulation.

  • Dam Height: 248 m
  • Reservoir Total Storage: 474 million m³
  • Live Storage: 350 million m³
  • Spillway: Ogee, non-gated overflow designed for extreme flood handling up to PMF conditions
  • Flood Handling: Designed for extreme hydrological scenarios including PMF-level inflows

Waterway System

The project features a highly engineered hydraulic layout designed for high-head energy transfer:

  • ~8.2 km concrete-lined headrace tunnel (horse-shoe profile)
  • Surge shaft system (165 m high, 16 m diameter)
  • Multi-section steel-lined pressure shafts and drop shafts
  • Underground powerhouse and transformer caverns
  • Fully optimized high-pressure conveyance system for efficiency and stability

Powerhouse

  • Underground powerhouse complex
  • Pelton turbine configuration optimized for high-head operation
  • Robust geological setting with sandstone host rock conditions

Transmission & Grid Integration

  • ~112 km high-voltage transmission line
  • 400 kV double-circuit design
  • Direct interconnection to a major regional substation hub

Energy Output

  • Annual Generation: ~1,280 GWh
  • Firm Energy: ~672 GWh
  • Secondary Energy: ~608 GWh
  • Strong seasonal load balancing and export capability

Estimated Project Cost (OPCC)

  • Total CAPEX: ~USD 1.3 – 1.4 billion (depending on transmission scope)
  • Fully itemized civil, electro-mechanical, hydro-mechanical, and infrastructure components included

Key Investment Highlights

  • Large-scale storage hydropower asset with high head efficiency
  • Long-life infrastructure with underground powerhouse design
  • Strong geological and hydrological resource base
  • High flexibility for peak load and export markets

Financial Forecast

Parameter / Metric Conservative Scenario ($65/MWh) Base Scenario ($75/MWh) Optimistic Scenario ($85/MWh)
Annual Generation 1,280,000 MWh 1,280,000 MWh 1,280,000 MWh
Estimated Gross Revenue ~$83,200,000 USD ~$96,000,000 USD ~$108,800,000 USD
Estimated OPEX(O&M, Admin, Insurance) ~$10,000,000 USD ~$12,000,000 USD ~$13,000,000 USD
Estimated EBITDA ~$73,200,000 USD ~$84,000,000 USD ~$95,800,000 USD
EBITDA Margin ~88% ~87.5% ~88%

MergersCorp M&A
International As Seen On

  • brand 1
  • brand 1
  • brand 1
  • brand 1
  • brand 1