    Fully Permitted 9.6 MW / 25 MWh Stand-Alone Battery Storage (BESS) Portfolio

    Description

    L#20261195

    An opportunity to acquire 100% of the project rights and Special Purpose Vehicles (SPVs) holding a portfolio of three stand-alone Battery Energy Storage System (BESS) projects located in Piedmont, Northern Italy.

    The aggregate portfolio represents 9.6 MW of nominal power and 25.0 MWh of storage capacity, strategically engineered to participate in wholesale energy arbitrage, capacity markets (MACSE), and ancillary grid services. All assets are fully permitted, grid-secured, and de-risked from real estate constraints.

    Portfolio Breakdown & Technical Specifications

    The opportunity can be acquired as a unified portfolio or structured via individual sub-projects:

    Project Identifier Nominal Power (MW) Nominal Storage (MWh) Duration (C-Rate) Inverter (PCS) Setup Battery Units Grid Level Permitting Status Land Security

    Project Alpha

    4.8 MW

    10.0 MWh

    ~2.1h (0.48C)

    2 × 2.4 MW

    2 × 5.0 MWh

    Medium Voltage (MT)

    Fully Permitted (PAS)

    SPV-Owned Freehold

    Project Beta

    2.4 MW

    10.0 MWh

    ~4.2h (0.24C)

    1 × 2.4 MW

    2 × 5.0 MWh

    Medium Voltage (MT)

    Fully Permitted (PAS)

    SPV-Owned Freehold

    Project Gamma

    2.4 MW

    5.0 MWh

    ~2.1h (0.48C)

    1 × 2.4 MW

    1 × 5.0 MWh

    Medium Voltage (MT)

    Fully Permitted (PAS)

    SPV-Owned Freehold

    Total Portfolio 9.6 MW 25.0 MWh 2.6h avg 4 × PCS units 5 × 5 MWh units

    MT Grid

    + 2

    100% PAS Authorized

    + 2

    100% Freehold Owned

    + 2

    Key Investment Highlights

    • Fully Authorized (RTB Stage): All projects hold definitive authorization obtained via the simplified permitting procedure (PAS – Procedura Abilitativa Semplificata), including all associated administrative prescriptions.

    • Secured Grid Interconnection: Interconnection solution accepted at Medium Voltage (MT) with binding technical connection agreements (TICA accettata) formally in place.

    • Land Freehold Secured: The real estate plots are directly owned in fee simple by the project SPV(s), removing third-party lease risks, surface right expiries, or ongoing land rent charges.

    • Controlled Network Works Execution: Grid connection works can be executed directly by the project sponsor/buyer to ensure tight schedule supervision, direct supplier interfaces, and optimized energization timelines.

    • Engineering & Safety Compliance: Preliminary engineering layouts, single-line diagrams, perimeter security setbacks, and dedicated secondary emergency access routes compliant with Fire Department (Vigili del Fuoco) requirements have been incorporated into the project designs.

    Transaction Structure & Process

      • Perimeter: 100% equity transfer of the clean corporate vehicles (SPVs) holding all authorizations, grid rights, land titles, and engineering documentation.

      • Due Diligence Access: Comprehensive Virtual Data Room (VDR) is established and accessible to qualified buyers upon execution of a standard Non-Disclosure Agreement (NDA).

        • VDR Contents: Authorizing permits & prescriptions, TICA contracts & grid correspondence, land deeds, corporate files, single-line diagrams, layout drawings, fire safety concept, and EPC construction timelines.

      • Pricing & Bidding: The asset is offered without a fixed price expectation. Financial terms and pricing models are to be agreed upon through bilateral discussions and submitted via a non-binding indicative Term Sheet.

    Basic Details

    Target Price:

    EUR 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261195

    Country

    Italy

    City:

    Torino

    Detail

    Business ID:L#20261195
    Property Type:Renewable Energy - Solar PV & BESS
    Property Status:For Sale
    Target Price: EUR 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on October 20, 2026 at 7:45 pm. Updated on October 20, 2026 at 7:50 pm

      An opportunity to acquire 100% of the project rights and Special Purpose Vehicles (SPVs) holding a portfolio of three stand-alone Battery Energy Storage System (BESS) projects located in Piedmont, Northern Italy.

      The aggregate portfolio represents 9.6 MW of nominal power and 25.0 MWh of storage capacity, strategically engineered to participate in wholesale energy arbitrage, capacity markets (MACSE), and ancillary grid services. All assets are fully permitted, grid-secured, and de-risked from real estate constraints.

      Portfolio Breakdown & Technical Specifications

      The opportunity can be acquired as a unified portfolio or structured via individual sub-projects:

      Project Identifier Nominal Power (MW) Nominal Storage (MWh) Duration (C-Rate) Inverter (PCS) Setup Battery Units Grid Level Permitting Status Land Security

      Project Alpha

      4.8 MW

      10.0 MWh

      ~2.1h (0.48C)

      2 × 2.4 MW

      2 × 5.0 MWh

      Medium Voltage (MT)

      Fully Permitted (PAS)

      SPV-Owned Freehold

      Project Beta

      2.4 MW

      10.0 MWh

      ~4.2h (0.24C)

      1 × 2.4 MW

      2 × 5.0 MWh

      Medium Voltage (MT)

      Fully Permitted (PAS)

      SPV-Owned Freehold

      Project Gamma

      2.4 MW

      5.0 MWh

      ~2.1h (0.48C)

      1 × 2.4 MW

      1 × 5.0 MWh

      Medium Voltage (MT)

      Fully Permitted (PAS)

      SPV-Owned Freehold

      Total Portfolio 9.6 MW 25.0 MWh 2.6h avg 4 × PCS units 5 × 5 MWh units

      MT Grid

      + 2

      100% PAS Authorized

      + 2

      100% Freehold Owned

      + 2

      Key Investment Highlights

      • Fully Authorized (RTB Stage): All projects hold definitive authorization obtained via the simplified permitting procedure (PAS – Procedura Abilitativa Semplificata), including all associated administrative prescriptions.

      • Secured Grid Interconnection: Interconnection solution accepted at Medium Voltage (MT) with binding technical connection agreements (TICA accettata) formally in place.

      • Land Freehold Secured: The real estate plots are directly owned in fee simple by the project SPV(s), removing third-party lease risks, surface right expiries, or ongoing land rent charges.

      • Controlled Network Works Execution: Grid connection works can be executed directly by the project sponsor/buyer to ensure tight schedule supervision, direct supplier interfaces, and optimized energization timelines.

      • Engineering & Safety Compliance: Preliminary engineering layouts, single-line diagrams, perimeter security setbacks, and dedicated secondary emergency access routes compliant with Fire Department (Vigili del Fuoco) requirements have been incorporated into the project designs.

      Transaction Structure & Process

        • Perimeter: 100% equity transfer of the clean corporate vehicles (SPVs) holding all authorizations, grid rights, land titles, and engineering documentation.

        • Due Diligence Access: Comprehensive Virtual Data Room (VDR) is established and accessible to qualified buyers upon execution of a standard Non-Disclosure Agreement (NDA).

          • VDR Contents: Authorizing permits & prescriptions, TICA contracts & grid correspondence, land deeds, corporate files, single-line diagrams, layout drawings, fire safety concept, and EPC construction timelines.

        • Pricing & Bidding: The asset is offered without a fixed price expectation. Financial terms and pricing models are to be agreed upon through bilateral discussions and submitted via a non-binding indicative Term Sheet.