web analytics
Contact M&A Advisor








    94 MW / 376 MWh Ready-to-Build BESS

    Description

    L#20261145

    A 94 MW / 376 MWh standalone Battery Energy Storage System (BESS) in Brescia, Lombardy, Northern Italy. The project is at an advanced Ready-to-Build (RTB) stage and benefits from a confirmed STMG grid-connection solution with the grid bay already assigned. The authorization process is advanced, with estimated completion targeted for 2026 / early 2027, offering investors the opportunity to access a substantially more mature development-stage BESS project with reduced development risk compared with early-stage opportunities.

    KEY INVESTMENT HIGHLIGHTS

    Project Type Standalone BESS
    Power Capacity 94 MW
    Storage Capacity 376 MWh
    Duration 4 Hours
    Battery Technology Lithium-Ion
    Land Requirement ~2 hectares
    Location Brescia, Lombardy, Italy
    Project Stage RTB – Ready-to-Build
    Authorization Status Advanced
    Expected Authorization Completion 2026 / Early 2027
    Grid Status STMG Confirmed
    Grid Bay Already Assigned
    Land Status Acquisition
    Transaction Acquisition / Co-Development

    PROJECT OVERVIEW

    The project comprises a 94 MW / 376 MWh lithium-ion BESS with a four-hour storage duration.

    With only approximately 2 hectares of land required, the project offers a highly efficient footprint for a utility-scale energy-storage facility.

    The project has reached the Ready-to-Build stage, representing a significant advancement in the development cycle. The authorization process is already advanced, with completion currently estimated for 2026 / early 2027.

    Importantly, the project’s grid connection bay has already been assigned, providing additional visibility and reducing one of the key development uncertainties typically associated with standalone BESS projects.

    GRID CONNECTION

    Confirmed STMG | Grid Bay Already Assigned

    The project benefits from a confirmed STMG grid-connection solution.

    Unlike early-stage projects where grid access may remain subject to significant uncertainty, this opportunity has progressed to the point where the connection bay has already been assigned.

    Grid connection status:

    • STMG: Confirmed
    • Grid bay: Already assigned
    • Connection timeline: Defined / assigned
    • Project stage: RTB

    This positioning provides a potentially attractive entry point for investors seeking exposure to Italian BESS projects with a more advanced grid position.

    DEVELOPMENT & AUTHORIZATION

    Project Status: Ready-to-Build

    The authorization process is currently described as advanced, with an estimated conclusion in:

    2026 – Early 2027

    This places the project significantly further along the development pathway than greenfield or early-stage BESS opportunities.

    LAND & SITE

    • Gross land area: ~2 hectares
    • Land classification: Agricultural
    • Land strategy: Acquisition
    • Location: Brescia, Lombardy, Italy
    • Indicative land acquisition cost: €450,000 / ~US$522,000

    The approximately 2-hectare footprint represents a highly efficient land requirement relative to the project’s 94 MW power capacity.

    INDICATIVE DEVELOPMENT COSTS

    Based on the currently available project information:

    Item EUR Approx. USD*
    STMG Cost €146,340 ~US$170,000
    Land Acquisition €450,000 ~US$522,000
    Total Identified Costs €596,340 ~US$692,000

    Note: These figures represent the identified STMG and land costs only and should not be interpreted as total project development or construction CAPEX.

    TRANSACTION OPPORTUNITY

    The project offers potential investors two principal entry structures:

    1. PROJECT ACQUISITION

    Acquisition of the RTB BESS project, including its existing development position, confirmed STMG and assigned grid connection bay.

    2. CO-DEVELOPMENT

    Partnership with the existing project owner to complete the remaining authorization and development milestones and progress the project toward construction and operation.

    INVESTMENT RATIONALE

    RTB-Stage Project

    The project has reached Ready-to-Build status, substantially reducing early-stage development risk.

    94 MW / 376 MWh

    A meaningful utility-scale storage asset with a four-hour duration, providing substantial energy-storage capability.

    Grid Bay Already Assigned

    The assigned grid bay represents a key competitive advantage and provides greater certainty around the project’s grid-connection pathway.

    Confirmed STMG

    The project has already secured a confirmed STMG grid-connection solution.

    Advanced Authorization

    The authorization process is advanced, with estimated completion in 2026 / early 2027.

    Highly Compact Footprint

    Only approximately 2 hectares are required for the project, supporting an attractive land-to-capacity ratio.

    Strategic Northern Italian Location

    Located in Brescia, Lombardy, one of Italy’s economically significant and highly industrialized regions, providing strategic positioning within the Northern Italian power market

    Metric / Assumption Conservative Moderate (Base) Aggressive Market Benchmark / Notes
    All-in EPC & BoS (€/MWh) €205,000 €180,000 €160,000 DC container blocks, PCS, BMS, EMS
    Grid Works & Interconnection (€M) €12.00M €10.00M €8.50M Bay already assigned (direct hook-up)
    Development, Land & Closing Fees (€M) €4.00M €3.50M €3.00M 2 ha land (€450k) + permit closing fees
    Total CAPEX (€M) €93.08M €81.18M €71.66M All-in turnkey project cost
    Senior Debt Facility (70%) €65.16M €56.83M €50.16M Bank debt tranche
    Equity Contribution (30%) €27.92M €24.35M €21.50M Sponsor equity required
    Contracted Revenue (MACSE / CM) €26,000 / MWh-yr €31,000 / MWh-yr €35,000 / MWh-yr 15-year capacity premium
    Merchant Arbitrage & Ancillary (MSD) €45,000 / MW-yr €68,000 / MW-yr €90,000 / MW-yr Arbitrage spread + grid balancing in North
    Total OPEX (€/MW-yr) €19,000 €16,000 €13,500 O&M, Route-to-Market, taxes, insurance
    Annual Battery Degradation 1.7% / yr 1.4% / yr 1.1% / yr ~1.1 to 1.3 equivalent daily cycles
    ========================================================================================
    FINANCIAL LINE ITEM (EUR Millions)        CONSERVATIVE     MODERATE (BASE)    AGGRESSIVE
    ========================================================================================
    Contracted Revenue (MACSE / Capacity)        €9.78M           €11.66M          €13.16M
    Merchant Spread & Ancillary (MSD)            €4.23M            €6.39M           €8.46M
    ----------------------------------------------------------------------------------------
    GROSS REVENUE                               €14.01M           €18.05M          €21.62M
    OPEX & Commercial Asset Management          (€1.79M)          (€1,50M)         (€1.27M)
    ----------------------------------------------------------------------------------------
    EBITDA                                      €12.22M           €16.55M          €20.35M
    EBITDA Margin                                87.2%             91.7%            94.1%
    Straight-Line Depreciation (15 Years)       (€6.21M)          (€5.41M)         (€4.78M)
    ----------------------------------------------------------------------------------------
    EBIT                                         €6.01M           €11.14M          €15.57M
    Senior Debt Interest (Year 1 @ 4.25%)       (€2.77M)          (€2.42M)         (€2.13M)
    ----------------------------------------------------------------------------------------
    EBT (Earnings Before Taxes)                  €3.24M            €8.72M          €13.44M
    Italian Corporate Income Tax (27.9%)        (€0.90M)          (€2.43M)         (€3.75M)
    ----------------------------------------------------------------------------------------
    NET INCOME                                   €2.34M            €6.29M           €9.69M
    + Non-Cash Depreciation                      €6.21M            €5.41M           €4.78M
    - Debt Principal Repayment (Year 1)         (€3.18M)          (€2.77M)         (€2.45M)
    ----------------------------------------------------------------------------------------
    FREE CASH FLOW TO EQUITY (FCFE, Year 1)      €5.37M            €8.93M          €12.02M
    ========================================================================================
    

    Informational & Preliminary Nature Only This summary is provided for informational and preliminary evaluation purposes only and does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation to enter into any transaction or purchase any securities, real property, or assets. Any transaction will be subject to the negotiation and execution of definitive, legally binding documentation.

    Forward-Looking Statements & Projections

    Any financial projections, estimates, benchmarks, revenue ranges, or EBITDA forecasts contained herein are forward-looking statements based on current industry assumptions, market conditions, and hypothetical operating models. These statements involve substantial risks, uncertainties, and assumptions, including but not limited to:

    • Fluctuations in local and national power markets, regulatory tariffs, and utility interconnection rules.

    • Variations in construction timelines, supply chain availability, and capital expenditure costs for modular, powered-shell, or turnkey builds.

    • Shifting demand, pricing dynamics, and vacancy rates in the data center, AI/HPC, and cloud infrastructure sectors.

    • Macroeconomic factors, including interest rates, tax laws, and general financing market conditions.

    Actual operational and financial results may differ materially from those expressed or implied in these projections. Past performance and illustrative scenarios are not guarantees of future performance.

    Independent Due Diligence & Verification Neither the seller, broker, advisors, nor their respective affiliates, officers, or representatives make any express or implied representation or warranty regarding the accuracy, completeness, or reliability of the information provided herein (including utility availability, zoning, environmental conditions, site acreage, or equipment specifications).

    Prospective purchasers, investors, and developers are solely responsible for conducting their own independent technical, legal, engineering, financial, environmental, and tax due diligence. Recipients are strongly advised to consult with their own professional legal, financial, and technical advisors before committing capital or executing binding agreements.

    Basic Details

    Target Price:

    $ 18,800,000

    Gross Revenue

    $14,010,000

    EBITDA

    $12,220,000

    Business ID:

    L#20261145

    Country

    Italy

    City:

    Brescia

    Detail

    Business ID:L#20261145
    Property Type:Renewable Energy - Solar PV & BESS
    Property Status:For Sale
    Target Price: $ 18,800,000
    Gross Revenue:$ 14,010,000
    EBITDA:$ 12,220,000
    Target Price / Revenue:1.34x
    Target Price / EBITDA:1.54x
    Contact M&A Advisor








      Published on September 7, 2026 at 8:03 am. Updated on September 7, 2026 at 8:03 am

      A 94 MW / 376 MWh standalone Battery Energy Storage System (BESS) in Brescia, Lombardy, Northern Italy. The project is at an advanced Ready-to-Build (RTB) stage and benefits from a confirmed STMG grid-connection solution with the grid bay already assigned. The authorization process is advanced, with estimated completion targeted for 2026 / early 2027, offering investors the opportunity to access a substantially more mature development-stage BESS project with reduced development risk compared with early-stage opportunities.

      KEY INVESTMENT HIGHLIGHTS

      Project Type Standalone BESS
      Power Capacity 94 MW
      Storage Capacity 376 MWh
      Duration 4 Hours
      Battery Technology Lithium-Ion
      Land Requirement ~2 hectares
      Location Brescia, Lombardy, Italy
      Project Stage RTB – Ready-to-Build
      Authorization Status Advanced
      Expected Authorization Completion 2026 / Early 2027
      Grid Status STMG Confirmed
      Grid Bay Already Assigned
      Land Status Acquisition
      Transaction Acquisition / Co-Development

      PROJECT OVERVIEW

      The project comprises a 94 MW / 376 MWh lithium-ion BESS with a four-hour storage duration.

      With only approximately 2 hectares of land required, the project offers a highly efficient footprint for a utility-scale energy-storage facility.

      The project has reached the Ready-to-Build stage, representing a significant advancement in the development cycle. The authorization process is already advanced, with completion currently estimated for 2026 / early 2027.

      Importantly, the project’s grid connection bay has already been assigned, providing additional visibility and reducing one of the key development uncertainties typically associated with standalone BESS projects.

      GRID CONNECTION

      Confirmed STMG | Grid Bay Already Assigned

      The project benefits from a confirmed STMG grid-connection solution.

      Unlike early-stage projects where grid access may remain subject to significant uncertainty, this opportunity has progressed to the point where the connection bay has already been assigned.

      Grid connection status:

      This positioning provides a potentially attractive entry point for investors seeking exposure to Italian BESS projects with a more advanced grid position.

      DEVELOPMENT & AUTHORIZATION

      Project Status: Ready-to-Build

      The authorization process is currently described as advanced, with an estimated conclusion in:

      2026 – Early 2027

      This places the project significantly further along the development pathway than greenfield or early-stage BESS opportunities.

      LAND & SITE

      The approximately 2-hectare footprint represents a highly efficient land requirement relative to the project’s 94 MW power capacity.

      INDICATIVE DEVELOPMENT COSTS

      Based on the currently available project information:

      Item EUR Approx. USD*
      STMG Cost €146,340 ~US$170,000
      Land Acquisition €450,000 ~US$522,000
      Total Identified Costs €596,340 ~US$692,000

      Note: These figures represent the identified STMG and land costs only and should not be interpreted as total project development or construction CAPEX.

      TRANSACTION OPPORTUNITY

      The project offers potential investors two principal entry structures:

      1. PROJECT ACQUISITION

      Acquisition of the RTB BESS project, including its existing development position, confirmed STMG and assigned grid connection bay.

      2. CO-DEVELOPMENT

      Partnership with the existing project owner to complete the remaining authorization and development milestones and progress the project toward construction and operation.

      INVESTMENT RATIONALE

      RTB-Stage Project

      The project has reached Ready-to-Build status, substantially reducing early-stage development risk.

      94 MW / 376 MWh

      A meaningful utility-scale storage asset with a four-hour duration, providing substantial energy-storage capability.

      Grid Bay Already Assigned

      The assigned grid bay represents a key competitive advantage and provides greater certainty around the project’s grid-connection pathway.

      Confirmed STMG

      The project has already secured a confirmed STMG grid-connection solution.

      Advanced Authorization

      The authorization process is advanced, with estimated completion in 2026 / early 2027.

      Highly Compact Footprint

      Only approximately 2 hectares are required for the project, supporting an attractive land-to-capacity ratio.

      Strategic Northern Italian Location

      Located in Brescia, Lombardy, one of Italy’s economically significant and highly industrialized regions, providing strategic positioning within the Northern Italian power market

      Metric / Assumption Conservative Moderate (Base) Aggressive Market Benchmark / Notes
      All-in EPC & BoS (€/MWh) €205,000 €180,000 €160,000 DC container blocks, PCS, BMS, EMS
      Grid Works & Interconnection (€M) €12.00M €10.00M €8.50M Bay already assigned (direct hook-up)
      Development, Land & Closing Fees (€M) €4.00M €3.50M €3.00M 2 ha land (€450k) + permit closing fees
      Total CAPEX (€M) €93.08M €81.18M €71.66M All-in turnkey project cost
      Senior Debt Facility (70%) €65.16M €56.83M €50.16M Bank debt tranche
      Equity Contribution (30%) €27.92M €24.35M €21.50M Sponsor equity required
      Contracted Revenue (MACSE / CM) €26,000 / MWh-yr €31,000 / MWh-yr €35,000 / MWh-yr 15-year capacity premium
      Merchant Arbitrage & Ancillary (MSD) €45,000 / MW-yr €68,000 / MW-yr €90,000 / MW-yr Arbitrage spread + grid balancing in North
      Total OPEX (€/MW-yr) €19,000 €16,000 €13,500 O&M, Route-to-Market, taxes, insurance
      Annual Battery Degradation 1.7% / yr 1.4% / yr 1.1% / yr ~1.1 to 1.3 equivalent daily cycles
      ========================================================================================
      FINANCIAL LINE ITEM (EUR Millions)        CONSERVATIVE     MODERATE (BASE)    AGGRESSIVE
      ========================================================================================
      Contracted Revenue (MACSE / Capacity)        €9.78M           €11.66M          €13.16M
      Merchant Spread & Ancillary (MSD)            €4.23M            €6.39M           €8.46M
      ----------------------------------------------------------------------------------------
      GROSS REVENUE                               €14.01M           €18.05M          €21.62M
      OPEX & Commercial Asset Management          (€1.79M)          (€1,50M)         (€1.27M)
      ----------------------------------------------------------------------------------------
      EBITDA                                      €12.22M           €16.55M          €20.35M
      EBITDA Margin                                87.2%             91.7%            94.1%
      Straight-Line Depreciation (15 Years)       (€6.21M)          (€5.41M)         (€4.78M)
      ----------------------------------------------------------------------------------------
      EBIT                                         €6.01M           €11.14M          €15.57M
      Senior Debt Interest (Year 1 @ 4.25%)       (€2.77M)          (€2.42M)         (€2.13M)
      ----------------------------------------------------------------------------------------
      EBT (Earnings Before Taxes)                  €3.24M            €8.72M          €13.44M
      Italian Corporate Income Tax (27.9%)        (€0.90M)          (€2.43M)         (€3.75M)
      ----------------------------------------------------------------------------------------
      NET INCOME                                   €2.34M            €6.29M           €9.69M
      + Non-Cash Depreciation                      €6.21M            €5.41M           €4.78M
      - Debt Principal Repayment (Year 1)         (€3.18M)          (€2.77M)         (€2.45M)
      ----------------------------------------------------------------------------------------
      FREE CASH FLOW TO EQUITY (FCFE, Year 1)      €5.37M            €8.93M          €12.02M
      ========================================================================================
      

      Informational & Preliminary Nature Only This summary is provided for informational and preliminary evaluation purposes only and does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation to enter into any transaction or purchase any securities, real property, or assets. Any transaction will be subject to the negotiation and execution of definitive, legally binding documentation.

      Forward-Looking Statements & Projections

      Any financial projections, estimates, benchmarks, revenue ranges, or EBITDA forecasts contained herein are forward-looking statements based on current industry assumptions, market conditions, and hypothetical operating models. These statements involve substantial risks, uncertainties, and assumptions, including but not limited to:

      Actual operational and financial results may differ materially from those expressed or implied in these projections. Past performance and illustrative scenarios are not guarantees of future performance.

      Independent Due Diligence & Verification Neither the seller, broker, advisors, nor their respective affiliates, officers, or representatives make any express or implied representation or warranty regarding the accuracy, completeness, or reliability of the information provided herein (including utility availability, zoning, environmental conditions, site acreage, or equipment specifications).

      Prospective purchasers, investors, and developers are solely responsible for conducting their own independent technical, legal, engineering, financial, environmental, and tax due diligence. Recipients are strongly advised to consult with their own professional legal, financial, and technical advisors before committing capital or executing binding agreements.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1