web analytics
Contact M&A Advisor








    490 kW Hydroelectric Power Plant

    Description

    L#20261221
    An analysis of the operational parameters and technical ledger outlines an active small-scale hydroelectric power plant located in the Lazio Region, characterized by long-term subsidized remuneration and an extended concession horizon.

    1. Technical Profile & Concession Framework

    • Location & Administrative Region: Lazio Region
    • Operating Status: Active and grid-connected (attivo).
    • Plant Classification: Hydroelectric (run-of-river).
    • Capacity & Hydraulic Parameters:
      • Maximum Electrical Capacity: 0.49 MW (490 kW).
      • Hydraulic Head: 2.20 m.
    • Regulatory Framework & Timeline:
      • Incentive Feed-in Tariff: Fixed subsidized tariff of €205.86 / MWh (equivalent to €0.20586 / kWh).
      • Tariff Expiration Date: December 26, 2038 (over 12 years of guaranteed feed-in revenue remaining).
      • Water Derivation Concession Expiration: January 31, 2048 (over 21 years of remaining concession validity).

    2. Key Operational & Financial Metrics

    Parameter Value Description / Derivation
    Installed / Maximum Capacity 490 kW (0.49 MW) Peak nominal power output
    Gross Hydraulic Head 2.20 m Low-head run-of-river configuration
    Average Annual Output 2,000,000 kWh/year (2.00 GWh) Normalized baseline production
    Equivalent Full-Load Hours 4,082 hours/year Calculated on 490 kW maximum capacity
    Feed-in Tariff (GSE) €205.86 / MWh (€0.20586 / kWh) Guaranteed feed-in tariff
    Annual Electricity Turnover ca. €400,000 / year Reported annual revenue (~€411,720 at full tariff)
    Guaranteed Tariff Horizon Through Dec 26, 2038 ~12 years of protected pricing
    Concession Expiration Through Jan 31, 2048 ~21+ years of residual concession lifespan

    3. Investment & Commercial Highlights

    1. Guaranteed Revenue Stream (2026–2038):
      • The asset operates under a fixed feed-in tariff of €205.86 / MWh through December 2038, sheltering cash flows from power market volatility for more than a decade.
      • With an average volume of 2.00 GWh/year, the facility generates approximately €400,000 to €412,000 in gross annual revenues.
    2. Residual Commercial Upside Post-Tariff (2039–2048):
      • Following tariff expiry in December 2038, the plant retains over 9 years of active concession rights through January 2048.
      • During this secondary phase, generation can be sold into the merchant wholesale market (PUN / market parity) or contracted via corporate Power Purchase Agreements (PPAs) on a fully depreciated asset base.

    Basic Details

    Target Price:

    EUR 4,900,000

    Gross Revenue

    €450,000

    EBITDA

    €390,000

    Business ID:

    L#20261221

    Country

    Italy

    Detail

    Business ID:L#20261221
    Property Type:Renewable Energy - Hydropower
    Property Status:For Sale
    Target Price: EUR 4,900,000
    Gross Revenue:EUR 450,000
    EBITDA:EUR 390,000
    Target Price / Revenue:10.89x
    Target Price / EBITDA:12.56x
    Contact M&A Advisor








      Published on November 3, 2026 at 1:15 pm. Updated on November 3, 2026 at 1:18 pm

      An analysis of the operational parameters and technical ledger outlines an active small-scale hydroelectric power plant located in the Lazio Region, characterized by long-term subsidized remuneration and an extended concession horizon.

      1. Technical Profile & Concession Framework

      • Location & Administrative Region: Lazio Region
      • Operating Status: Active and grid-connected (attivo).
      • Plant Classification: Hydroelectric (run-of-river).
      • Capacity & Hydraulic Parameters:
        • Maximum Electrical Capacity: 0.49 MW (490 kW).
        • Hydraulic Head: 2.20 m.
      • Regulatory Framework & Timeline:
        • Incentive Feed-in Tariff: Fixed subsidized tariff of €205.86 / MWh (equivalent to €0.20586 / kWh).
        • Tariff Expiration Date: December 26, 2038 (over 12 years of guaranteed feed-in revenue remaining).
        • Water Derivation Concession Expiration: January 31, 2048 (over 21 years of remaining concession validity).

      2. Key Operational & Financial Metrics

      Parameter Value Description / Derivation
      Installed / Maximum Capacity 490 kW (0.49 MW) Peak nominal power output
      Gross Hydraulic Head 2.20 m Low-head run-of-river configuration
      Average Annual Output 2,000,000 kWh/year (2.00 GWh) Normalized baseline production
      Equivalent Full-Load Hours 4,082 hours/year Calculated on 490 kW maximum capacity
      Feed-in Tariff (GSE) €205.86 / MWh (€0.20586 / kWh) Guaranteed feed-in tariff
      Annual Electricity Turnover ca. €400,000 / year Reported annual revenue (~€411,720 at full tariff)
      Guaranteed Tariff Horizon Through Dec 26, 2038 ~12 years of protected pricing
      Concession Expiration Through Jan 31, 2048 ~21+ years of residual concession lifespan

      3. Investment & Commercial Highlights

      1. Guaranteed Revenue Stream (2026–2038):
        • The asset operates under a fixed feed-in tariff of €205.86 / MWh through December 2038, sheltering cash flows from power market volatility for more than a decade.
        • With an average volume of 2.00 GWh/year, the facility generates approximately €400,000 to €412,000 in gross annual revenues.
      2. Residual Commercial Upside Post-Tariff (2039–2048):
        • Following tariff expiry in December 2038, the plant retains over 9 years of active concession rights through January 2048.
        • During this secondary phase, generation can be sold into the merchant wholesale market (PUN / market parity) or contracted via corporate Power Purchase Agreements (PPAs) on a fully depreciated asset base.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1