    2.52 MWp Ground-Mounted Solar PV Project with Single-axis Trackers in Abruzzo Central Italy

    Description

    L#20261186

    The Project comprises a 2.52 MWp plant with bifacial modules on single-axis trackers and a 2.50 MW grid injection capacity, with an accepted medium-voltage grid connection solution from the local distribution system operator (DSO) and the land secured through preliminary surface-rights agreements.

    Construction is currently scheduled to start in Q1 2027. The opportunity is suited to IPPs, infrastructure and energy-transition funds, and industrial investors seeking a mid-size, near-construction position in the Italian solar market.

    INVESTMENT HIGHLIGHTS

    • Secured grid access: 20 kV MV connection solution issued by the DSO, amended to an underground-cable route and accepted in May 2024; 30% of the connection fee already paid and the detailed design of the grid works (PTO) submitted in November 2024.
    • Efficient technology: 3,528 bifacial monocrystalline 715 Wp modules on single-axis trackers, 8 × 320 kW string inverters and a 1,600 kVA transformer, delivering a specific yield of c. 1,460 kWh/kWp.
    • Compact, low-impact footprint: the plant occupies c. 1.06 ha of a c. 4.8 ha site (c. 22% coverage) on land zoned as building land, reducing land-use and landscape sensitivities.
    • Competitive cost base: total CAPEX of c. €2.28m (c. €0.91/Wp), with annual operating costs of c. €65k.
    • Attractive cash generation: expected revenues of c. €313k p.a. and EBITDA of c. €248k p.a. (c. 79% margin) based on Seller estimates.
    • Supportive market: Italy’s National Energy and Climate Plan (PNIEC) targets c. 80 GW of installed solar PV by 2030, underpinning demand for construction-ready capacity.

    KEY PROJECT DATA

    Location Abruzzo region, Central Italy
    Technology Ground-mounted PV, bifacial monocrystalline modules (715 Wp class) on single-axis trackers
    Installed capacity (DC) 2,522.52 kWp (3,528 modules; 126 strings of 28 modules)
    Grid injection capacity (AC) 2,500 kW
    Inverters / transformer 8 × 320 kW (2,560 kW total) / 1 × 1,600 kVA
    Expected production 3,683 MWh/year (1,460 equivalent hours)
    Site area 48,090 m² cadastral area; 10,566 m² plant area (c. 22%)
    Land rights Preliminary surface-rights agreements with the landowners for c. €29k per year in aggregate
    Permitting route Single Regional Authorisation (Autorizzazione Unica) including zoning change to industrial use
    Grid connection New customer delivery substation (DSO standard box) connected in-out on an existing 20 kV MV line; c. 1.8 km underground Al 185 mm² cable; 103 working days for DSO works
    Expected start of construction 1 March 2027

    DEVELOPMENT STATUS & MILESTONES

    June 2023 Grid connection request submitted to the DSO
    September 2023 First connection quote received
    February 2024 Amendment requested for an underground cable solution
    May 2024 Amended connection quote received and accepted (connection fee €246k excl. VAT; 30% paid)
    November 2024 Detailed design of the grid connection works (PTO) submitted
    Q1 2027 Expected start of construction

    Note: status of the Single Regional Authorisation and validity of the grid solution to be confirmed in the data room.

    INDICATIVE ECONOMICS (SELLER ESTIMATES)

    Total CAPEX €2,283,421 (c. €0.91/Wp)
    Expected annual revenue €313,045 (implied c. €85/MWh)
    Annual operating costs €65,314
    Expected annual EBITDA c. €247,700 (c. 79% margin)
    Grid connection cost €246,211 excl. VAT (€73,863 paid; c. €37,789 refundable by the DSO after testing if the grid works are self-built)
    Illustrative unlevered pre-tax IRR c. 9–10%

    Illustrative IRR computed by MergersCorp on Seller figures: 25–30-year life, flat revenue and operating costs, 0.4% annual module degradation, no leverage, no tax and no terminal value. For indicative purposes only.

    PROPOSED TRANSACTION & PROCESS

    • Perimeter: acquisition of 100% of the project company holding the Project’s rights, permits, grid connection and land agreements.
    • Structure: share deal (to be confirmed); consideration and payment terms to be proposed by bidders.
    • Next steps: execution of a Non-Disclosure Agreement, followed by access to an Information Memorandum and virtual data room, and submission of non-binding indications of interest.

    Basic Details

    Target Price:

    EUR 0

    Gross Revenue

    €313,000

    EBITDA

    €247,000

    Business ID:

    L#20261186

    Country

    Italy

    Detail

    Business ID:L#20261186
    Property Type:Renewable Energy - Solar PV, Renewable Energy
    Property Status:For Sale
    Target Price: EUR 0
    Gross Revenue:EUR 313,000
    EBITDA:EUR 247,000
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on October 2, 2026 at 7:47 am. Updated on October 2, 2026 at 7:47 am

      The Project comprises a 2.52 MWp plant with bifacial modules on single-axis trackers and a 2.50 MW grid injection capacity, with an accepted medium-voltage grid connection solution from the local distribution system operator (DSO) and the land secured through preliminary surface-rights agreements.

      Construction is currently scheduled to start in Q1 2027. The opportunity is suited to IPPs, infrastructure and energy-transition funds, and industrial investors seeking a mid-size, near-construction position in the Italian solar market.

      INVESTMENT HIGHLIGHTS

      KEY PROJECT DATA

      Location Abruzzo region, Central Italy
      Technology Ground-mounted PV, bifacial monocrystalline modules (715 Wp class) on single-axis trackers
      Installed capacity (DC) 2,522.52 kWp (3,528 modules; 126 strings of 28 modules)
      Grid injection capacity (AC) 2,500 kW
      Inverters / transformer 8 × 320 kW (2,560 kW total) / 1 × 1,600 kVA
      Expected production 3,683 MWh/year (1,460 equivalent hours)
      Site area 48,090 m² cadastral area; 10,566 m² plant area (c. 22%)
      Land rights Preliminary surface-rights agreements with the landowners for c. €29k per year in aggregate
      Permitting route Single Regional Authorisation (Autorizzazione Unica) including zoning change to industrial use
      Grid connection New customer delivery substation (DSO standard box) connected in-out on an existing 20 kV MV line; c. 1.8 km underground Al 185 mm² cable; 103 working days for DSO works
      Expected start of construction 1 March 2027

      DEVELOPMENT STATUS & MILESTONES

      June 2023 Grid connection request submitted to the DSO
      September 2023 First connection quote received
      February 2024 Amendment requested for an underground cable solution
      May 2024 Amended connection quote received and accepted (connection fee €246k excl. VAT; 30% paid)
      November 2024 Detailed design of the grid connection works (PTO) submitted
      Q1 2027 Expected start of construction

      Note: status of the Single Regional Authorisation and validity of the grid solution to be confirmed in the data room.

      INDICATIVE ECONOMICS (SELLER ESTIMATES)

      Total CAPEX €2,283,421 (c. €0.91/Wp)
      Expected annual revenue €313,045 (implied c. €85/MWh)
      Annual operating costs €65,314
      Expected annual EBITDA c. €247,700 (c. 79% margin)
      Grid connection cost €246,211 excl. VAT (€73,863 paid; c. €37,789 refundable by the DSO after testing if the grid works are self-built)
      Illustrative unlevered pre-tax IRR c. 9–10%

      Illustrative IRR computed by MergersCorp on Seller figures: 25–30-year life, flat revenue and operating costs, 0.4% annual module degradation, no leverage, no tax and no terminal value. For indicative purposes only.