    150-MWp Solar PV Photovoltaic Farm in Kosovo (RTB)

    Description

    L#20261049

    The Kosovo 150 MW Solar PV Project is a strategically located renewable energy development designed to meet the country’s growing electricity demand while supporting its long-term energy transition.

    With all key permits secured and grid connection approved, the project is currently in its final pre-construction phase, offering immediate readiness for investment and construction.

    Key Project Highlights

    • Installed Capacity: 150 MWp
    • Expected Annual Generation: 240,000 MWh
    • Yield Factor: 1,600 kWh per kWp installed
    • Grid Connection: Approved and secured 110 kV transmission line
    • Land & Permits: Fully secured (environmental, land-use, construction permits)
    • Project Status: Advanced development stage – ready for construction

    Financial Overview

    • Total Project CAPEX: €110 million
    • Annual OPEX: €1.53 million
    • Revenue Potential: At €62/MWh tariff, projected annual revenue of ~€17.4 million
    • Average Annual Net Cash Flow: ~€15.5 million
    • Equity IRR: 19%
    • Equity Payback Period: 5.5 years
    • NPV (12% discount rate): €19.2 million
    • Levelized Cost of Energy (LCOE): €30/MWh
    • Financing: Senior debt financing has been successfully secured and ratified via banking institutions.

    Market & Investment Potential

    Kosovo is actively advancing the diversification of its energy mix, with a strong focus on reducing reliance on coal and accelerating renewable energy deployment.

    This project aligns closely with national energy transition goals and EU integration objectives, particularly in reducing emissions and expanding clean power generation capacity.

    With a fully secured permitting package and approved grid connection, the project benefits from a low-risk development profile and a clear path to execution.

    Once operational, the solar PV plant will deliver long-term, cost-efficient renewable electricity, strengthening energy security and supporting sustainable economic growth.

    Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.

    Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.

    Disclaimer

    All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.

    Financial Forecast

    Financial / Technical Parameter Value / Detail
    Location / Project Name Kosovo (Dielli PV Farm)
    Installed Capacity 150 MWp (plus integrated 100/200 MW/MWh BESS)
    Target Price / Equity Stake TBD (Seller seeking 30% strategic equity partner)
    Total Project CAPEX €110,000,000 EUR
    Expected Annual Generation 240,000 MWh (Yield Factor: ~1,600 kWh/kWp)
    Assumed Electricity Tariff €66 / MWh
    Estimated Annual Gross Revenue ~€18,480,000 EUR
    Estimated Annual OPEX ~€1,800,000 EUR (O&M, land lease, insurance, admin)
    Estimated Annual EBITDA ~€16,680,000 EUR (Revenue minus OPEX)
    Implied EBITDA Margin ~90.3%
    Projected Equity IRR 15% – 20%
    Project Status Ready-to-Build (RTB) / Fully Permitted

    Basic Details

    Target Price:

    $ 20,000,000

    Gross Revenue

    $18,480,000

    EBITDA

    $16,480,000

    Business ID:

    L#20261049

    Country

    Kosovo

    Detail

    Business ID:L#20261049
    Property Type:Renewable Energy - Solar PV
    Property Status:For Sale
    Target Price: $ 20,000,000
    Gross Revenue:$ 18,480,000
    EBITDA:$ 16,480,000
    Target Price / Revenue:1.08x
    Target Price / EBITDA:1.21x
    Contact M&A Advisor








      Published on May 5, 2026 at 2:57 pm. Updated on August 10, 2026 at 8:01 am

      The Kosovo 150 MW Solar PV Project is a strategically located renewable energy development designed to meet the country’s growing electricity demand while supporting its long-term energy transition.

      With all key permits secured and grid connection approved, the project is currently in its final pre-construction phase, offering immediate readiness for investment and construction.

      Key Project Highlights

      Financial Overview

      Market & Investment Potential

      Kosovo is actively advancing the diversification of its energy mix, with a strong focus on reducing reliance on coal and accelerating renewable energy deployment.

      This project aligns closely with national energy transition goals and EU integration objectives, particularly in reducing emissions and expanding clean power generation capacity.

      With a fully secured permitting package and approved grid connection, the project benefits from a low-risk development profile and a clear path to execution.

      Once operational, the solar PV plant will deliver long-term, cost-efficient renewable electricity, strengthening energy security and supporting sustainable economic growth.

      Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.

      Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.

      Disclaimer

      All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.

      Financial Forecast

      Financial / Technical Parameter Value / Detail
      Location / Project Name Kosovo (Dielli PV Farm)
      Installed Capacity 150 MWp (plus integrated 100/200 MW/MWh BESS)
      Target Price / Equity Stake TBD (Seller seeking 30% strategic equity partner)
      Total Project CAPEX €110,000,000 EUR
      Expected Annual Generation 240,000 MWh (Yield Factor: ~1,600 kWh/kWp)
      Assumed Electricity Tariff €66 / MWh
      Estimated Annual Gross Revenue ~€18,480,000 EUR
      Estimated Annual OPEX ~€1,800,000 EUR (O&M, land lease, insurance, admin)
      Estimated Annual EBITDA ~€16,680,000 EUR (Revenue minus OPEX)
      Implied EBITDA Margin ~90.3%
      Projected Equity IRR 15% – 20%
      Project Status Ready-to-Build (RTB) / Fully Permitted