web analytics
Contact M&A Advisor








    1,000 MW Utility-Scale Battery Storage BESS

    Description

    L#20261118

    An opportunity to acquire or invest in a high-capacity, grid-connected Battery Energy Storage System (BESS) portfolio in South-Eastern Europe. The pipeline comprises 4 Special Purpose Vehicles (SPVs) covering 5 distinct utility-scale projects with a combined target capacity of 504 MW installed power and 1,010 MWh storage capacity.

    Strategically positioned across three key energy regions, the portfolio captures structural market inefficiencies driven by high Day-Ahead Market (DAM) price spreads and growing renewable integration needs.

    Key Portfolio Highlights

    • Scale & Capacity: 504 MW installed power / 1,010 MWh storage capacity distributed across 651 storage units.

    • De-Risked Status: All 5 projects are Ready-to-Build (RTB) with signed Grid Connection Technical Approvals (ATR) and approved connection studies.

    • Grid Connectivity: Direct connections secured across 2 Transmission System Operator (TSO) nodes—including a direct 400 kV high-voltage connection—and 2 Distribution System Operator (DSO) nodes.

    • Site Control: Right-of-superficies and urban planning certificates secured; financial guarantees posted to network operators.

    Market & Revenue Opportunities

    1. Energy Market Arbitrage: Capitalizing on regional energy market volatility and substantial daily price spreads (average daily peak/off-peak spread reaching ~€168/MWh).

    2. Ancillary & Balancing Services: Sub-second response capability tailored for national grid frequency regulation and balancing reserve contracts with the TSO.

    3. Regulatory Tailwinds: Supported by an EU-approved national BESS funding framework (€150M scheme) and national storage buildout targets of 1,200 MW by 2030.

    Projected Financial Summary (Base Case)

    • Total Estimated Portfolio CAPEX: ~€247.5 Million

    • Estimated Annual Gross Revenue: ~€99.6 Million

    • Estimated Annual EBITDA: ~€76.6 Million (~70% EBITDA Margin)

    • Blended Project IRR (15-Year Nominal): ~20% – 21%

    • Net Present Value (NPV @ 9% WACC): ~€140.6 Million (Base Scenario) up to ~€303.2 Million depending on market sizing assumptions

    • Simple Payback Period: ~4.7 Years

    Asset Breakdown

    Project SPV Region / Node Installed Power Max Export Capacity Storage Capacity Grid Voltage / Operator
    Asset 1 Location 1 259 MW Direct Grid Connection ~750 MWh

    High-Voltage TSO/DSO Node

    Asset 2 Location 2 67.5 MW 66.2 MW ~135.4 MWh

    110 kV – Regional DSO Substation

    Asset 3 Location 3 160 MW 55.0 MW ~330.2 MWh

    110 kV – National TSO Substation

    Asset 4 Location 1 212 MW 202.1 MW ~424.0 MWh

    400 kV – Direct National RET Connection

    Asset 5 Location 1 64 MW 58.9 MW ~120.3 MWh

    110 kV – National TSO Substation

    Investment Rationale

    • First-Mover Advantage: Establishes immediate scale in one of Europe’s fastest-growing energy storage markets.

    • High Cash Flow Yield: Strong top-line revenue potential (€120–€180/kW/year optimized across wholesale and balancing markets).

    • De-Risked Execution: RTB status reduces development timelines, allowing swift deployment of capital.

    For further information, full Non-Disclosure Agreements (NDAs), and Data Room access, please contact the advising transaction representative.

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261118

    Country

    Romania

    Detail

    Business ID:L#20261118
    Property Type:Renewable Energy
    Property Status:For Sale
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on August 7, 2026 at 5:35 pm. Updated on August 7, 2026 at 5:36 pm

      An opportunity to acquire or invest in a high-capacity, grid-connected Battery Energy Storage System (BESS) portfolio in South-Eastern Europe. The pipeline comprises 4 Special Purpose Vehicles (SPVs) covering 5 distinct utility-scale projects with a combined target capacity of 504 MW installed power and 1,010 MWh storage capacity.

      Strategically positioned across three key energy regions, the portfolio captures structural market inefficiencies driven by high Day-Ahead Market (DAM) price spreads and growing renewable integration needs.

      Key Portfolio Highlights

      Market & Revenue Opportunities

      1. Energy Market Arbitrage: Capitalizing on regional energy market volatility and substantial daily price spreads (average daily peak/off-peak spread reaching ~€168/MWh).

      2. Ancillary & Balancing Services: Sub-second response capability tailored for national grid frequency regulation and balancing reserve contracts with the TSO.

      3. Regulatory Tailwinds: Supported by an EU-approved national BESS funding framework (€150M scheme) and national storage buildout targets of 1,200 MW by 2030.

      Projected Financial Summary (Base Case)

      Asset Breakdown

      Project SPV Region / Node Installed Power Max Export Capacity Storage Capacity Grid Voltage / Operator
      Asset 1 Location 1 259 MW Direct Grid Connection ~750 MWh

      High-Voltage TSO/DSO Node

      Asset 2 Location 2 67.5 MW 66.2 MW ~135.4 MWh

      110 kV – Regional DSO Substation

      Asset 3 Location 3 160 MW 55.0 MW ~330.2 MWh

      110 kV – National TSO Substation

      Asset 4 Location 1 212 MW 202.1 MW ~424.0 MWh

      400 kV – Direct National RET Connection

      Asset 5 Location 1 64 MW 58.9 MW ~120.3 MWh

      110 kV – National TSO Substation

      Investment Rationale

      For further information, full Non-Disclosure Agreements (NDAs), and Data Room access, please contact the advising transaction representative.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1