7x Portfolio Hydroelectric Power Plants in Italy with 20 Years PPA  [19GWh]

administrator

Property Types

  • 14% Renewable Energy
  • 12% Manufacturing
  • 12% Financial Services
  • 61% Other

Property Status

  • 100% For Sale

Property Cities

  • 14% Zug
  • 11% Geneva
  • 5% London
  • 70% Other

About administrator

Sort by:

0 Review

Sort by:
Leave a Review

Leave a Review

Renewable energy has developed rapidly in Italy over the past decade and provided the country a means of diversifying from its historical dependency on imported fuels.

All 8,047 Italian municipalities have deployed some source of renewable energy, with hydroelectric power being the leading renewable energy source in terms of production. Bio energy, wind power and geothermal power also make an important contribution to national energy demands.

Italy has implemented generous incentive schemes to encourage the development of renewable energy production. Its largest scheme incentivised solar PV production and lead Italy from a low base of installed PV in 2010 to become the world’s fourth largest country by installations by the end of 2014, ahead of the US at that time.

All sources of renewable energy have grown in Italy during recent years and many continue to receive incentives. In the last decade, Italy has become one of the world’s largest producers of renewable energy, ranking as the second largest producer in the European Union and the ninth in the world.

*Gross Revenue figures based on a Projection, numbers subjected to due diligence

HYDRO POWER PLANT 1 / CENTRALE IDROELETTRICA 1 / WASSERKRAFTANLAGE 1
Typology / Tipologia / Typologie hydraulic auger plant (single auger) / centrale a coclea idraulica (coclea singola) / Hydraulische Schneckenanlage (Einzelschnecke)
Accomplished are / Realizzata su / Vollendet Sind ground state property in concession / terreno demaniale in concessione / Boden Staatseigentum In Konzession
Expiration concession derivation / Scadenza concessione derivazione / Ablauf Konzession Ableitung november 2042 /novembre 2042 / November 2042
Scope maximum derivatives / Portata massima derivabile / Umfang maximal Derivate mc/s 6,5
jump net / Salto netto / springen Netz mc/s 5,00
Power nominal Of concession / Potenza nominale di concessione / Leistung nominell Von Konzession kW 135
Power Of entry / Potenza di immissione / Leistung nominell Von Konzession kW 255
Power nominal generator / Potenza nominale generatore / Leistung nominell Generator kW 300
Data completion jobs Of construction / Data completamento lavori di costruzione / Daten Fertigstellung Arbeitsplätze Von Konstruktion 28/09 2022
Incentives / Incentivi / Anreize DM 2019 with rate 2016 (art 7.1) Of 0,21 /
DM 2019 con tariffa 2016 (art 7.1) di 0,21 /
DM 2019 mit Rate 2016 (Kunst 7.1) Von 0,21
 €/kW Data entrance in exercise first parallel) /  €/kW Data entrata in esercizio primo parallelo) / €/kW Daten Eingang In Übung Erste parallel) 28/09/2022 /
Entry request date in ex. commercial / Data richiesta di entrata in es. commerciale / Eintrittsantragsdatum in ex. Werbung 31/01/2024 (editable in function from the eventualassignment ownership)
31/01/2024 (modificabile in funzione della eventuale cessione titolarità) /
31.01.2024 (bearbeitbar In Funktion von dem eventuell Abtretung Eigentum)
Period Of enjoyment of the incentive / Domanda conferma Incentivo / Anfrage er bestätigt Anreiz 20 years from the date of entry into commercial operation (from vary according to any transfer) /
20 anni dalla data di entrata in esercizio commerciale (da variare in funzione di eventuale cessione) /
20 Jahre ab dem Datum der Aufnahme des kommerziellen Betriebs (ab variieren je nach Übertragung)
Request he confirms insentive / Domanda conferma Incentivo /Anfrage er bestätigt Anreiz Already presented / già presentata /Bereits vorgeführt
Expected production / Produzione attesa / Voraussichtliche Produktion kWh 1.150.000
HYDRO POWER PLANT 2 / CENTRALE IDROELETTRICA 2 / WASSERKRAFTANLAGE 2
Typology / Tipologia / Typologie hydraulic auger plant (double auger) / centrale a coclea idraulica (doppia coclea) / Hydraulische Schneckenanlage (Doppelschnecke)
Accomplished are / Realizzata su / Vollendet Sind owned land / terreno di proprietà / besessenes Land
Expiration concession derivation / Scadenza concessione derivazione / Ablauf Konzession Ableitung October 2043 / ottobre 2043 / Oktober 2043
Scope maximum derivatives / Portata massima derivabile / Umfang maximal Derivate  mc/s 10
jump net / Salto netto / springen Netz m 3,90
Power nominal Of concession / Potenza nominale di concessione / Leistung nominell Von Konzession kW 179,96
Power Of entry / Potenza di immissione / Leistung nominell Von Konzession kW 290
Power nominal generator / Potenza nominale generatore / Leistung nominell Generator kW 400
Data completion jobs Of construction / Data completamento lavori di costruzione / Daten Fertigstellung Arbeitsplätze Von Konstruktion 26/09 2022
Incentives / Incentivi / Anreize DM 2019 with rate 2016 (art 7.1) Of 0,21 /
DM 2019 con tariffa 2016 (art 7.1) di 0,21 /
DM 2019 mit Rate 2016 (Kunst 7.1) Von 0,21
 €/kW Data entrance in exercise first parallel) /  €/kW Data entrata in esercizio primo parallelo) / €/kW Daten Eingang In Übung Erste parallel) 26/09/2022
Entry request date in ex. commercial / Data richiesta di entrata in es. commerciale / Eintrittsantragsdatum in ex. Werbung 31/01/2024 (editable in function from the eventual assignment ownership)
31/01/2024 (modificabile in funzione della eventuale cessione titolarità) /
31.01.2024 (bearbeitbar In Funktion von dem eventuell Abtretung Eigentum)
Period Of enjoyment of the incentive / Domanda conferma Incentivo / Anfrage er bestätigt Anreiz 20 years from the date of entry into commercial operation (from vary according to any transfer) /
20 anni dalla data di entrata in esercizio commerciale (da variare in funzione di eventuale cessione) /
20 Jahre ab dem Datum der Aufnahme des kommerziellen Betriebs (ab variieren je nach Übertragung)
Request he confirms insentive / Domanda conferma Incentivo /Anfrage er bestätigt Anreiz Already presented / già presentata /Bereits vorgeführt
Expected production / Produzione attesa / Voraussichtliche Produktion kWh 1.250.000
HYDRO POWER PLANT 3 / CENTRALE IDROELETTRICA 3 / WASSERKRAFTANLAGE 3
Typology / Tipologia / Typologie hydraulic auger plant (double auger) / centrale a coclea idraulica (doppia coclea) / Hydraulische Schneckenanlage (Doppelschnecke)
Accomplished are / Realizzata su / Vollendet Sind owned land / terreno di proprietà / besessenes Land
Expiration concession derivation / Scadenza concessione derivazione / Ablauf Konzession Ableitung November 2042 / novembre 2042 / November 2042
Scope maximum derivatives / Portata massima derivabile / Umfang maximal Derivate mc/s 10
jump net / Salto netto / springen Netz m 6,67
Power nominal Of concession / Potenza nominale di concessione / Leistung nominell Von Konzession kW 224
Power Of entry / Potenza di immissione / Leistung nominell Von Konzession kW 470
Power nominal generator / Potenza nominale generatore / Leistung nominell Generator kW 615
Data completion jobs Of construction / Data completamento lavori di costruzione / Daten Fertigstellung Arbeitsplätze Von Konstruktion 29/09 2022
Incentives / Incentivi / Anreize DM 2019 with rate 2016 (art 7.1) Of 0,21 /
DM 2019 con tariffa 2016 (art 7.1) di 0,21 /
DM 2019 mit Rate 2016 (Kunst 7.1) Von 0,21
 €/kW Data entrance in exercise first parallel) /  €/kW Data entrata in esercizio primo parallelo) / €/kW Daten Eingang In Übung Erste parallel) 29/09/2022
Entry request date in ex. commercial / Data richiesta di entrata in es. commerciale / Eintrittsantragsdatum in ex. Werbung 31/01/2024 (editable in function from the eventual assignment ownership)
31/01/2024 (modificabile in funzione della eventuale cessione titolarità) /
31.01.2024 (bearbeitbar In Funktion von dem eventuell Abtretung Eigentum)
Period Of enjoyment of the incentive / Domanda conferma Incentivo / Anfrage er bestätigt Anreiz 20 years from the date of entry into commercial operation (from vary according to any transfer) /
20 anni dalla data di entrata in esercizio commerciale (da variare in funzione di eventuale cessione) /
20 Jahre ab dem Datum der Aufnahme des kommerziellen Betriebs (ab variieren je nach Übertragung)
Request he confirms insentive / Domanda conferma Incentivo /Anfrage er bestätigt Anreiz Already presented / già presentata /Bereits vorgeführt
Expected production / Produzione attesa / Voraussichtliche Produktion kWh 1.962.000
HYDRO POWER PLANT 4 / CENTRALE IDROELETTRICA 4 / WASSERKRAFTANLAGE 4
Typology / Tipologia / Typologie hydraulic auger plant (double auger) / centrale a coclea idraulica (doppia coclea) / Hydraulische Schneckenanlage (Doppelschnecke)
Scope maximum derivatives / Portata massima derivabile / Umfang maximal Derivate mc/s 8
Salt Net / Salti netto / Salz Netz m 5,14
Power nominal Of concession / Potenza nominale di concessione / Leistung nominell Von Konzession kW 224,6
Power Of entry / Potenza di immissione / Leistung nominell Von Konzession kW 330
Power nominal generator / Potenza nominale generatore / Leistung nominell Generator kW 400
Data completion jobs Of construction / Data completamento lavori di costruzione / Daten Fertigstellung Arbeitsplätze Von Konstruktion 14/04/2016
Incentives / Incentivi / Anreize DM 2012 with rate clear Of 0,206 /
DM 2012 con tariffa netta di 0,206 /
DM 2012 mit Rate klar Von 0,206
 €/kW Data entrance in exercise first parallel) /  €/kW Data entrata in esercizio primo parallelo) / €/kW Daten Eingang In Übung Erste parallel) 12.04.2016
Period Of enjoyment of the incentive / Domanda conferma Incentivo / Anfrage er bestätigt Anreiz 20 years from the date of entry into commercial opera /
20 anni dalla data di entrata in esercizio /
20 Jahre ab Eintritt in die kommerzielle Oper
HYDRO POWER PLANT 5 / CENTRALE IDROELETTRICA 5 / WASSERKRAFTANLAGE 5
Type /  Tipo /  Typ
Power media Of concession /  Potenza media di concessione / Leistung Medien Von Konzession kW 1,525
Power maximum installed / Potenza massima installata / Leistung maximal Eingerichtet kW 2.660
 jump / Salto / springen m 110
Expiration concession / Scadenza concessione / Ablauf Konzession 2043
Production annual /  Produzione annuale / Produktion jährlich kWh 10.000.000
Values incentive /  Valori incentivo / Werte Anreiz Price hours Area + GRIN / Prezzo orario zonale + GRIN / Preis Std. Bereich + GRINSEN
Duration incentives /  Durata incentivi / Dauer Anreize Expiration 12/2027 / Scadenza 12/2027 / Ablauf 12/2027
Type transaction / Tipo transazione / Typ Transaktion Assignment quote society Of scope / Cessione quote società di scopo / Abtretung zitieren Gesellschaft Von Umfang
HYDRO POWER PLANT 6 / CENTRALE IDROELETTRICA 6 / WASSERKRAFTANLAGE 6
Type /  Tipo /  Typ
Power media Of concession /  Potenza media di concessione / Leistung Medien Von Konzession kW 215
Power maximum installed / Potenza massima installata / Leistung maximal Eingerichtet kW 530
 jump / Salto / springen m 44
Expiration concession / Scadenza concessione / Ablauf Konzession 2029
Production annual /  Produzione annuale / Produktion jährlich kWh 1.800.000
Values incentive /  Valori incentivo / Werte Anreiz Rate All encompassing / Tariffa Onnicomprensiva / Rate Alles umfassend
Duration incentives /  Durata incentivi / Dauer Anreize Expiration 06/2025 /Scadenza 06/2025 / Ablauf 06/2025
Type transaction / Tipo transazione / Typ Transaktion Assignment quote society Of scope / Cessione quote società di scopo /Abtretung zitieren Gesellschaft Von Umfang
HYDRO POWER PLANT 7 / CENTRALE IDROELETTRICA 7 / WASSERKRAFTANLAGE 7
Type /  Tipo /  Typ
Power media Of concession /  Potenza media di concessione / Leistung Medien Von Konzession kW 211
Power maximum installed / Potenza massima installata / Leistung maximal Eingerichtet kW 350
 jump / Salto / springen m 30
Expiration concession / Scadenza concessione / Ablauf Konzession 2035
Production annual /  Produzione annuale / Produktion jährlich kWh 830.000
Values incentive /  Valori incentivo / Werte Anreiz Prices Minimum Guaranteed / Prezzi Minimi Garantiti / Preise Minimum Garantiert
Duration incentives /  Durata incentivi / Dauer Anreize
Type transaction / Tipo transazione / Typ Transaktion Assignment quote society Of scope / Cessione quote società di scopo /Abtretung zitieren Gesellschaft Von Umfang

MergersCorp M&A
International As Seen On

  • brand 1
  • brand 1
  • brand 1
  • brand 1
  • brand 1