Contact M&A Advisor






    captcha

    Copper Mining Business with a SX-EW plant (JORC certified)

    Description

    L#20230491

    This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300mln ton accumulated from 40 yrs of operation

    Resource Analysis

    • Wardell Armstrong (MRI, PCR) 2020
    • During2015-2016 ,the Company undertook exploration:
    • Reverse circulation(RC)drilling–47holes
    • SurfacePitting–141
    • ToePitting–26
    • more than 900 ore samples

    SX-EW plant Results

    • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
    • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
    • Over 36 tons of cathode copper sold on the local market at near LME prices.
    • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
    • 400 m access road to the site — completed
    • 1.1 km water pipeline fo the site — completed
    • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
    • 1 km of piping for the heap irrigation — purchased, connected and laid out
    • Ponds and collection trenches — completed and lined with geomembrane

    SX-EW Business Model

    • Planned annual production: 10,000 fons of LME grade “A” cathode copper
    • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.
    • Key production cost drivers:
    1. Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
    2. Labor and Production Overheads (fixed)
    •  Mineral Extraction Tax @ 5.7% on value of copper in PLS
    •  Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract

    Basic Details

    Target Price:

    $100,000,000

    Gross Revenue

    TBA

    EBITDA

    TBA

    Business ID:

    L#20230491

    Country

    Kazakhstan

    Detail

    Business ID:L#20230491
    Property Type:Mining Businesses
    Property Status:For Sale
    Target Price: $100,000,000
    Gross Revenue:TBA
    EBITDA:TBA
    Target Price / Revenue:100000000x
    Target Price / EBITDA:100000000x
    Contact M&A Advisor






      captcha

      Similar Businesses

      Published on July 12, 2023 at 8:38 am. Updated on December 2, 2023 at 1:47 pm

      Gold mining Deposit

      TBA

      Mining Businesses

      Marble Quarry Business

      TBD

      Mining Businesses

      Premium Coal Mining Business

      TBD

      Mining Businesses

      Deposit of Bauxite and Aluminum

      TBD

      Mining Businesses

      Operational Gold Mine in Exploration

      $15,000,000

      Mining Businesses


      PREVIOUS PROPERTY

      Operative Shrimp Farm Business with 5.50 HA

      NEXT PROPERTY

      200MW Solar Photovoltaic Power Plants

      This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300mln ton accumulated from 40 yrs of operation

      Resource Analysis

      SX-EW plant Results

      SX-EW Business Model

      1. Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
      2. Labor and Production Overheads (fixed)

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1