web analytics
Contact M&A Advisor








    50MW Ready-to-Build (RTB) Hydroelectric Asset featuring a 240 GWh secured by a GOV Power Purchase Agreement (PPA)

    Description

    L#20261074

    The Hydroelectric Project represents a premier, high-yield renewable energy asset strategically situated in the water-abundant mountainous region of southern Kazakhstan. Currently at the Ready-to-Build (RTB) stage, this 50MW run-of-river facility is engineered to capitalize on optimal hydrological conditions, delivering a projected annual generation capacity of 233.97 GWh of clean, baseload electricity. This project is the HPP-1, a milestone engineering endeavor located on the hydro-energetically rich Bukhtarma River in the Altai District, East Kazakhstan Region.

    Investment Highlights

    • Secured Revenue Stream: Fully backed by a long-term Government Power Purchase Agreement (PPA), ensuring predictable, inflation-indexed cash flows and mitigating off-taker risk.

    • Strategic Infrastructure: The asset features a state-of-the-art concrete gravity dam, advanced generation facility, and dedicated substation infrastructure seamlessly integrated into the national grid.

    • ESG & Sustainability Impact: By generating over 233 GWh of zero-emission power annually, the plant will offset significant carbon emissions, directly supporting Kazakhstan’s national transition toward carbon neutrality.

    • Shovel-Ready Status: All primary environmental permits, land rights, and grid-connection approvals have been secured, allowing immediate commencement of civil works.

    Technical Profile

    Parameter Specification
    Capacity 50 MW
    Annual Yield 233.97 GWh
    Project Stage Ready-to-Build (RTB)
    Offtake Structure Sovereign-backed Government PPA
    Asset Type Run-of-River Hydroelectric

    Operational Mandate: Managed by a seasoned team of regional engineers and international energy experts, the project utilizes real-time telemetry and advanced hydrological modeling to optimize flow management and maximize generation efficiency.

    • Installed Capacity: 50 MW

    • Projected Annual Output: 233.97 GWh

    • Power Purchase Agreement (PPA): Fixed tarif, KZT 38.99 with RFC KEGOC (GOV) – $0.08 USD (8 US cents)
    • Structural Innovation: A 35.87-meter-high gravel-sand dam featuring an elastic composite geomembrane core, uniquely engineered to withstand deep sedimentary foundations and up to magnitude-8 seismic events.

    • Turbine Configuration: 4x high-efficiency Axial-flow Kaplan units (12.5 MW each) designed for optimized performance across volatile annual flow regimes.

    • Grid Infrastructure: Fully integrated via a 15.5 km double-circuit 110 kV line coupled with a state-of-the-art Gas Insulated Switchgear (GIS) substation for extreme climate reliability.

    • Commercial Viability: De-risked via a secured, long-term Power Purchase Agreement (PPA) featuring a guaranteed tariff of 38.99 KZT/kWh for 20 years.

    Operational & Engineering Capabilities

    This firm differentiates itself through an integrated project delivery framework that covers every critical milestone of large-scale renewable development:

    • Hydrological Excellence: Leveraging over 65 years of continuous historical flow data (1956–2022) to precisely model asset capacity factors and design for 1-in-500-year extreme flood events

    • Global Contracting Alliances: Partnering with world-class engineering organizations, including the East Kazakhstan branch of the China International Water & Electric Corporation, ensuring projects are delivered on time, within budget, and to international standard specifications.

    • Asset Digitalization: Transitioning toward fully automated, “staff-less” plant capabilities via modern SCADA architectures, redundant PLC gate-control systems, and predictive maintenance technologies.

    Financial Soundness & Governance

    The Owner maintains an institutional-grade financial footprint, utilizing a disciplined capital deployment model optimized for capital-intensive infrastructure projects.

    • Optimal Capital Structuring: Assets are typically capitalized through a highly structured 30% Equity / 70% Debt financing framework, maintaining robust debt service coverage ratios (DSCR).

    • Long-Term Predictability: Revenue streams are shielded from market volatility through government-backed, long-term off-take mechanisms, offering investors predictable, infrastructure-grade yield profiles.

    • Rigorous Risk Management: From extensive preliminary geotechnical drilling to rigorous ESG alignment, every project undergoes comprehensive risk mitigation prior to financial close.

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20261074

    Country

    Kazakhstan

    Detail

    Business ID:L#20261074
    Property Type:Renewable Energy
    Property Status:For Sale
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Published on May 25, 2026 at 4:15 pm. Updated on May 25, 2026 at 4:16 pm

      The Hydroelectric Project represents a premier, high-yield renewable energy asset strategically situated in the water-abundant mountainous region of southern Kazakhstan. Currently at the Ready-to-Build (RTB) stage, this 50MW run-of-river facility is engineered to capitalize on optimal hydrological conditions, delivering a projected annual generation capacity of 233.97 GWh of clean, baseload electricity. This project is the HPP-1, a milestone engineering endeavor located on the hydro-energetically rich Bukhtarma River in the Altai District, East Kazakhstan Region.

      Investment Highlights

      • Secured Revenue Stream: Fully backed by a long-term Government Power Purchase Agreement (PPA), ensuring predictable, inflation-indexed cash flows and mitigating off-taker risk.

      • Strategic Infrastructure: The asset features a state-of-the-art concrete gravity dam, advanced generation facility, and dedicated substation infrastructure seamlessly integrated into the national grid.

      • ESG & Sustainability Impact: By generating over 233 GWh of zero-emission power annually, the plant will offset significant carbon emissions, directly supporting Kazakhstan’s national transition toward carbon neutrality.

      • Shovel-Ready Status: All primary environmental permits, land rights, and grid-connection approvals have been secured, allowing immediate commencement of civil works.

      Technical Profile

      Parameter Specification
      Capacity 50 MW
      Annual Yield 233.97 GWh
      Project Stage Ready-to-Build (RTB)
      Offtake Structure Sovereign-backed Government PPA
      Asset Type Run-of-River Hydroelectric

      Operational Mandate: Managed by a seasoned team of regional engineers and international energy experts, the project utilizes real-time telemetry and advanced hydrological modeling to optimize flow management and maximize generation efficiency.

      • Installed Capacity: 50 MW

      • Projected Annual Output: 233.97 GWh

      • Power Purchase Agreement (PPA): Fixed tarif, KZT 38.99 with RFC KEGOC (GOV) – $0.08 USD (8 US cents)
      • Structural Innovation: A 35.87-meter-high gravel-sand dam featuring an elastic composite geomembrane core, uniquely engineered to withstand deep sedimentary foundations and up to magnitude-8 seismic events.

      • Turbine Configuration: 4x high-efficiency Axial-flow Kaplan units (12.5 MW each) designed for optimized performance across volatile annual flow regimes.

      • Grid Infrastructure: Fully integrated via a 15.5 km double-circuit 110 kV line coupled with a state-of-the-art Gas Insulated Switchgear (GIS) substation for extreme climate reliability.

      • Commercial Viability: De-risked via a secured, long-term Power Purchase Agreement (PPA) featuring a guaranteed tariff of 38.99 KZT/kWh for 20 years.

      Operational & Engineering Capabilities

      This firm differentiates itself through an integrated project delivery framework that covers every critical milestone of large-scale renewable development:

      • Hydrological Excellence: Leveraging over 65 years of continuous historical flow data (1956–2022) to precisely model asset capacity factors and design for 1-in-500-year extreme flood events

      • Global Contracting Alliances: Partnering with world-class engineering organizations, including the East Kazakhstan branch of the China International Water & Electric Corporation, ensuring projects are delivered on time, within budget, and to international standard specifications.

      • Asset Digitalization: Transitioning toward fully automated, “staff-less” plant capabilities via modern SCADA architectures, redundant PLC gate-control systems, and predictive maintenance technologies.

      Financial Soundness & Governance

      The Owner maintains an institutional-grade financial footprint, utilizing a disciplined capital deployment model optimized for capital-intensive infrastructure projects.

      • Optimal Capital Structuring: Assets are typically capitalized through a highly structured 30% Equity / 70% Debt financing framework, maintaining robust debt service coverage ratios (DSCR).

      • Long-Term Predictability: Revenue streams are shielded from market volatility through government-backed, long-term off-take mechanisms, offering investors predictable, infrastructure-grade yield profiles.

      • Rigorous Risk Management: From extensive preliminary geotechnical drilling to rigorous ESG alignment, every project undergoes comprehensive risk mitigation prior to financial close.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1