    6MW + 2MW PV Solar Italian Ready-to-Build PV Agrivoltaic & Photovoltaic Portfolio (Calabria)

    Description

    L#20261022

    This profile summarizes two high-priority solar energy projects in the Calabria region that have reached the Ready-to-Build (RTB) stage. Both projects have successfully completed the Simplified Authorization Procedure (PAS) and have achieved full legal efficacy through publication in the Official Bulletin of the Calabria Region (BURC).

    Executive Summary

    • Total Capacity: 6,009.60kW

    • Status: Fully Permitted / Ready-to-Build (RTB).

    • Commercial Terms: Offered at €145,000 per MW.

    • Administrative Lead: XXXXXXXXXXX (Sole Director for both SPVs).

    Project 1: Crotone Agrivoltaic

    This project integrates renewable energy production with agricultural land use in the Crotone province.

    • SPV: XXXXXXXXXXX

    • Location: Loc. Colombra, Crotone (KR), XXXXXXXXXXX

    • Capacity: 1,999.20 kW.

    • Grid Connection (TICA): €270,000.

    • Permitting Timeline:

      • PAS Submission: December 11, 2025.

      • Completion/Perfection: January 12, 2026.

      • BURC Publication: January 22, 2026 (BURC No. 15).

    Project 2: Pizzo Photovoltaic

    Located in the Vibo Valentia province on land pre-identified as suitable for solar development.

    • SPV: XXXXXXXXXXX S.R.L..

    • Location: Pizzo (VV), XXXXXXXXXXX

    • Capacity: 4,010.4kW

    • Grid Connection (TICA): €422,000.

    • Substation Proximity: 1.5 km.

    • Permitting Timeline:

      • PAS Submission: November 19, 2025.

      • Completion/Perfection: December 28, 2025.

      • BURC Publication: January 7, 2026 (BURC No. 3).

    Investment Highlights

    • Legal Certainty: Titles are fully opposable to third parties as the publication in the BURC has triggered the statutory limitation periods for any appeals.

    • Compliance: Both projects were authorized under the latest legislative framework (D.lgs 190/2024).

    • Strategic Positioning: Projects are located in high-irradiance zones in Southern Italy with clear land identification and connection parameters.

    Basic Details

    Target Price:

    EUR 870,000

    Business ID:

    L#20261022

    Country

    Italy

    State:

    Italy

    City:

    Crotone

    Detail

    Business ID:L#20261022
    Target Price: EUR 870,000
    Contact M&A Advisor








      Similar Businesses

      Published on March 29, 2026 at 5:29 pm. Updated on March 29, 2026 at 5:34 pm


      PREVIOUS PROPERTY

      AI-Led BPMS, IT Services & No-Code Software Platform

      This profile summarizes two high-priority solar energy projects in the Calabria region that have reached the Ready-to-Build (RTB) stage. Both projects have successfully completed the Simplified Authorization Procedure (PAS) and have achieved full legal efficacy through publication in the Official Bulletin of the Calabria Region (BURC).

      Executive Summary

      • Total Capacity: 6,009.60kW

      • Status: Fully Permitted / Ready-to-Build (RTB).

      • Commercial Terms: Offered at €145,000 per MW.

      • Administrative Lead: XXXXXXXXXXX (Sole Director for both SPVs).

      Project 1: Crotone Agrivoltaic

      This project integrates renewable energy production with agricultural land use in the Crotone province.

      • SPV: XXXXXXXXXXX

      • Location: Loc. Colombra, Crotone (KR), XXXXXXXXXXX

      • Capacity: 1,999.20 kW.

      • Grid Connection (TICA): €270,000.

      • Permitting Timeline:

        • PAS Submission: December 11, 2025.

        • Completion/Perfection: January 12, 2026.

        • BURC Publication: January 22, 2026 (BURC No. 15).

      Project 2: Pizzo Photovoltaic

      Located in the Vibo Valentia province on land pre-identified as suitable for solar development.

      • SPV: XXXXXXXXXXX S.R.L..

      • Location: Pizzo (VV), XXXXXXXXXXX

      • Capacity: 4,010.4kW

      • Grid Connection (TICA): €422,000.

      • Substation Proximity: 1.5 km.

      • Permitting Timeline:

        • PAS Submission: November 19, 2025.

        • Completion/Perfection: December 28, 2025.

        • BURC Publication: January 7, 2026 (BURC No. 3).

      Investment Highlights

      • Legal Certainty: Titles are fully opposable to third parties as the publication in the BURC has triggered the statutory limitation periods for any appeals.

      • Compliance: Both projects were authorized under the latest legislative framework (D.lgs 190/2024).

      • Strategic Positioning: Projects are located in high-irradiance zones in Southern Italy with clear land identification and connection parameters.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1