Contact M&A Advisor








    6MWp Agrivoltaic Project in Zungri

    Description

    L#20260987

    General Information

    • Location: Municipality of Zungri (VV) – Calabria Region, Italy
    • Nominal capacity: 6.0 MWp
    • Total surface area: approximately 11.6 hectares
    • Project status: Ready-To-Build (RTB)
    • Project ready for construction from 1 February 2026, with permitting, land availability, and grid connection fully completed.

    Land Registry and Legal Status

    – Plots registered in the Land Registry of the Municipality of Zungri (VV).
    – Land availability secured through surface rights and easements formalized by definitive notarial deeds.
    – Contract duration: 10 years + option to renew for an additional 20 years.

    Photovoltaic Plant Characteristics

    Parameter Details
    Type Advanced agrivoltaic system
    Support Structures Single-axis trackers
    Structure Height Approximately 2.10 meters above ground level
    System Configuration Designed to ensure continuity of agricultural activities and accessibility for machinery

    Agricultural Integration
    – Cultivation agreement signed with a local agricultural operator
    – Objective: to maintain agricultural land use and ensure compliance with advanced agrivoltaic guidelines
    – Benefits: coexistence of energy production and agricultural activity

    Permitting Status
    – Simplified Authorization Procedure (PAS) completed and published in the Official Bulletin of the Calabria Region No. 116 dated 24/05/2023.
    – No pending administrative constraints or legal disputes.

    Grid Connection
    – Grid operator: e-Distribuzione
    – Connection process: approved
    – Start of grid works: 1 February 2026
    – Method: shared connection works with two other plants, optimizing timelines and costs

    Investment Highlights
    – Ready-To-Build agrivoltaic project
    – Permitting and land risks fully mitigated
    – Cultivation agreement already executed
    – Approved grid connection with works scheduled
    – High bankability and strong regulatory alignment

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20260987

    Country

    Italy

    City:

    Zungri

    Detail

    Business ID:L#20260987
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Similar Businesses

      Published on January 24, 2026 at 6:15 pm. Updated on January 24, 2026 at 6:35 pm


      Crotone Agrivoltaic Project

      PREVIOUS PROPERTY

      2MWp Agrivoltaic Solar RTB Project in Crotone

      NEXT PROPERTY

      185 MW AC Solar Photovoltaic PV + 50MW BESS RTB + PPA

      185 MWac Solar PV + Large-Scale Storage

      General Information

      Land Registry and Legal Status

      – Plots registered in the Land Registry of the Municipality of Zungri (VV).
      – Land availability secured through surface rights and easements formalized by definitive notarial deeds.
      – Contract duration: 10 years + option to renew for an additional 20 years.

      Photovoltaic Plant Characteristics

      Parameter Details
      Type Advanced agrivoltaic system
      Support Structures Single-axis trackers
      Structure Height Approximately 2.10 meters above ground level
      System Configuration Designed to ensure continuity of agricultural activities and accessibility for machinery

      Agricultural Integration
      – Cultivation agreement signed with a local agricultural operator
      – Objective: to maintain agricultural land use and ensure compliance with advanced agrivoltaic guidelines
      – Benefits: coexistence of energy production and agricultural activity

      Permitting Status
      – Simplified Authorization Procedure (PAS) completed and published in the Official Bulletin of the Calabria Region No. 116 dated 24/05/2023.
      – No pending administrative constraints or legal disputes.

      Grid Connection
      – Grid operator: e-Distribuzione
      – Connection process: approved
      – Start of grid works: 1 February 2026
      – Method: shared connection works with two other plants, optimizing timelines and costs

      Investment Highlights
      – Ready-To-Build agrivoltaic project
      – Permitting and land risks fully mitigated
      – Cultivation agreement already executed
      – Approved grid connection with works scheduled
      – High bankability and strong regulatory alignment

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1