    A fully operational industrial facility located in the U.S. Midwest is available for sale and presents a compelling opportunity for rapid conversion into a high-capacity AI data center. The site was previously utilized for large-scale computing operations, providing a unique advantage in terms of expedited permitting, established infrastructure, and minimal community or regulatory friction. This enables near-term deployment of AI and cloud computing capacity.

    Keypoints

    • Site & Building: 21-acre site with an approximately 380,000 sq. ft. industrial facility

    • Immediate Power Availability: 150MW of operational utility power, supported by over three years of stable performance

    • Expansion Capacity: Approved pathway to scale total capacity to 299MW, including 149MW of incremental capacity confirmed by the utility

    • Electrical Infrastructure: Dedicated, owner-operated substation with four 138kV to 13.8kV transformers

    • Utility Reliability: No recorded history of brownouts or major outages; recognized as a priority customer by the utility provider

    • Development Timeline: Utility upgrade expected within 24–28 months post-agreement; expansion subject to an estimated ~$35 million standby letter of credit

    Strategic Advantages

    • Strategic Location: Positioned within a 600-mile radius of approximately 60% of the U.S. population, supporting low-latency deployment for AI and cloud services

    • Competitive Power Economics: Industrial electricity pricing below the U.S. national average (approximately $0.06/kWh based on a 24-month average), supporting cost-efficient operations

    • Sustainable Energy Profile: Strong nuclear baseload generation (approximately 32%of regional supply), complemented by access to renewable energy sources including wind and solar

    • Robust Connectivity: Access to an extensive regional fiber network, including availability of dark fiber, supported by a designated smart digital corridor

    • Favorable Regulatory Environment: Existing zoning, flexible height allowances, and reduced permitting risk driven by prior large-scale computing use

    Current Status

    • Asset is actively being marketed for sale

    • Load study has been completed; utility construction services agreement is in the final stages of negotiation

    • Engineering plans, financial models, and site visits are available upon

    Basic Details

    Target Price:

    $ 225,000,000

    Business ID:

    L#20261016

    Country

    United States

    Detail

    Business ID:L#20261016
    Target Price: $ 225,000,000
    Contact M&A Advisor








      Similar Businesses

      Published on March 23, 2026 at 7:47 am. Updated on March 23, 2026 at 7:54 am


      PREVIOUS PROPERTY

      8,769 kW Italian Hydro Power Plants Portfolio HPP (RTB)

      NEXT PROPERTY

      369 MW Solar + 1.4 GWh Storage RTB Investment Opportunity

      369 MW Solar + 1.4 GWh Storage RTB Investment Opportunity

      A fully operational industrial facility located in the U.S. Midwest is available for sale and presents a compelling opportunity for rapid conversion into a high-capacity AI data center. The site was previously utilized for large-scale computing operations, providing a unique advantage in terms of expedited permitting, established infrastructure, and minimal community or regulatory friction. This enables near-term deployment of AI and cloud computing capacity.

      Keypoints

      • Site & Building: 21-acre site with an approximately 380,000 sq. ft. industrial facility

      • Immediate Power Availability: 150MW of operational utility power, supported by over three years of stable performance

      • Expansion Capacity: Approved pathway to scale total capacity to 299MW, including 149MW of incremental capacity confirmed by the utility

      • Electrical Infrastructure: Dedicated, owner-operated substation with four 138kV to 13.8kV transformers

      • Utility Reliability: No recorded history of brownouts or major outages; recognized as a priority customer by the utility provider

      • Development Timeline: Utility upgrade expected within 24–28 months post-agreement; expansion subject to an estimated ~$35 million standby letter of credit

      Strategic Advantages

      • Strategic Location: Positioned within a 600-mile radius of approximately 60% of the U.S. population, supporting low-latency deployment for AI and cloud services

      • Competitive Power Economics: Industrial electricity pricing below the U.S. national average (approximately $0.06/kWh based on a 24-month average), supporting cost-efficient operations

      • Sustainable Energy Profile: Strong nuclear baseload generation (approximately 32%of regional supply), complemented by access to renewable energy sources including wind and solar

      • Robust Connectivity: Access to an extensive regional fiber network, including availability of dark fiber, supported by a designated smart digital corridor

      • Favorable Regulatory Environment: Existing zoning, flexible height allowances, and reduced permitting risk driven by prior large-scale computing use

      Current Status

      • Asset is actively being marketed for sale

      • Load study has been completed; utility construction services agreement is in the final stages of negotiation

      • Engineering plans, financial models, and site visits are available upon

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1