Contact M&A Advisor








    7.7 MW Hybrid Solar PV Project with 4 MW Battery Energy Storage System

    Description

    L#20250965

    This represents an outstanding investment opportunity to acquire a 100% equity stake in a hybrid project consisting of 7,7 MWp / 7,7 MWn of solar PV capacity together with 4 MW of BESS, located in the region of Badajoz, Spain.

    • Under construction Status: Will reach COD in the coming months, while the BESS will reach RtB by Q2 2027.

    • Significant Upside Potential: The design allows for the seamless integration of a future Battery Energy Storage System (BESS) without interrupting current production, offering a critical avenue for value enhancement.

    General Information

    • Technology: Solar PV, BESS
    • Total Installed Capacity: 11,7 MWp
    • Location: Spain (Badajoz)
    • Other Details: With a strong specific yield of 2.113 h, Project Hayek is already in operation and has hybridization potential for a future BESS installation.

    Solar PV Details & Design

    • Installed Capacity: 7,7 MWn / 7,7 MWp
    • Specific Production: 2.113 h
    • Development Status: COD
    • Commercial Operation Date (COD): Q1 2026
    • Panel Configuration: 2V
    • Module Power: 440 W
    • Type of Structure: 1-axis-tracker
    • Pitch Distance: 12 m
    • Module Type: LR4-72 HIH

    BESS Details & Design

    • Installed Capacity: 4 MW
    • Hours Cycles: 2,5 h
    • Development Status: Early Greenfield
    • Ready to Build (RtB) Date: Q2 2027
    • Commercial Operation Date (COD): Q4 2027
    • Injection Capacity: 4 MW
    • Consumption Capacity: 4 MW
    • Storage Capacity: 10 MWh
    • Storage Technology: Lithium Iron Phosphate (LFP) Battery

    Land Rights

    • Land Surface: 19,1 ha
    • Land Types: Rental
    • Land Price: 1.150 €/ha
    • Land Contracted Percentage: 100 %
    • Land Contract Duration: 40 years
    • Land Comments: The land lease agreements include renewal periods of 5 years each, with a maximum total extension period of 5 years.
    • Expropriation Status: Obtained
    • Expropriation Expected Date: Q4 2020
    • Expropriation Comments: No further DUP info at this stage.

    Financials

    • Energy offset: Merchant
    • Energy offset Details: The execution of a PPA will be responsibility of the buyer.
    • Financial details: The project has no debt in place.
    • Other Comments: Potential financing will be responsibility of the buyer

    NOTE: The Buyer is required to execute a Fee Agreement stipulating a commission rate of 2.25% of the final transaction value, payable upon closing.

    Basic Details

    Target Price:

    $ 0

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20250965

    Country

    Spain

    Detail

    Business ID:L#20250965
    Target Price: $ 0
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:TBD
    Target Price / EBITDA:TBD
    Contact M&A Advisor








      Similar Businesses

      Published on January 2, 2026 at 9:30 am. Updated on January 2, 2026 at 9:30 am

      Geothermal Exploration Business

      $150,000,000

      Renewable Energy

      62.50 MW PV Photovoltaic Project

      $8,500,000

      Renewable Energy

      25MW Solar Photovoltaic Project

      TBD

      Renewable Energy

      28.6MW Wind Farm Project

      TBD

      Renewable Energy


      Luxury yacht cruise tourism business for sale

      PREVIOUS PROPERTY

      Premier Luxury Yacht Cruise Tourism Business

      NEXT PROPERTY

      90-Year-Old Vintage Swiss para-banking institution

      This represents an outstanding investment opportunity to acquire a 100% equity stake in a hybrid project consisting of 7,7 MWp / 7,7 MWn of solar PV capacity together with 4 MW of BESS, located in the region of Badajoz, Spain.

      General Information

      Solar PV Details & Design

      • Installed Capacity: 7,7 MWn / 7,7 MWp
      • Specific Production: 2.113 h
      • Development Status: COD
      • Commercial Operation Date (COD): Q1 2026
      • Panel Configuration: 2V
      • Module Power: 440 W
      • Type of Structure: 1-axis-tracker
      • Pitch Distance: 12 m
      • Module Type: LR4-72 HIH

      BESS Details & Design

      • Installed Capacity: 4 MW
      • Hours Cycles: 2,5 h
      • Development Status: Early Greenfield
      • Ready to Build (RtB) Date: Q2 2027
      • Commercial Operation Date (COD): Q4 2027
      • Injection Capacity: 4 MW
      • Consumption Capacity: 4 MW
      • Storage Capacity: 10 MWh
      • Storage Technology: Lithium Iron Phosphate (LFP) Battery

      Land Rights

      • Land Surface: 19,1 ha
      • Land Types: Rental
      • Land Price: 1.150 €/ha
      • Land Contracted Percentage: 100 %
      • Land Contract Duration: 40 years
      • Land Comments: The land lease agreements include renewal periods of 5 years each, with a maximum total extension period of 5 years.
      • Expropriation Status: Obtained
      • Expropriation Expected Date: Q4 2020
      • Expropriation Comments: No further DUP info at this stage.

      Financials

      • Energy offset: Merchant
      • Energy offset Details: The execution of a PPA will be responsibility of the buyer.
      • Financial details: The project has no debt in place.
      • Other Comments: Potential financing will be responsibility of the buyer

      NOTE: The Buyer is required to execute a Fee Agreement stipulating a commission rate of 2.25% of the final transaction value, payable upon closing.

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1