    160MW PV Ready to Build Project

    Description

    L#20240699

    The total project consist 4 projects and is located in the Southern part of Romania, which has the highest irradiation in the country.

    Romania is a great location as it has 210 sunny days per year and with an annual solar energy flux between 1,000 kWh/m2/year and 1,300 kWh/m2/year.

    All project’s authorizations are in progress, and the buyer can get the building permit within 60 days after signing the SPA.

    AC Capacity [41.125+32.725+30.625+30.625] MWac 135.100 MWac
    DC Capacity [43.090+40.610+37.820+38.440] MWdc 159.960 MWdc
    PV panels [TIGER NEO N-TYPE Bifacial with dual glass, JINKO SOLAR] 620W
    PV inverters [SUN2000-185KTL H1, HUAWEI] 175 kW / 185 kW
    Mounting systems Fixed
    One HV220KV substation for all 4 projects Yes
    Location Southern Romania
    Estimated Yearly Power Production (MWh/MWp) 1,450
    KMZ file available Yes
    Total Land Surface – 6 Plots (ha) 160
    Land ownership -SVP Leasing Leasing (Superficie)
    Land Leasing Cost (Eur/ha/Year) Eur 1,700
    Leasing Conditions Indexation: 5% or HICP | 32
    Land Type Agriculture, Complete flat
    Zoning (PUZ) N/A
    Natura 2000 Overlap No
    Flooding Risk No
    Archaeological Risk No
    Urban Certificate – Valid Yes
    Land Class (OSPA) 3
    Pedological Study Yes
    Topological Study In progress
    Geodesic Study In progress
    Environmental Permit In progress
    Solution Study Yes
    Distance to 220KV grid connection aerial line TSO (km) 1.2
    Connection Permits for 220 kV TSO grid Yes
    Grid connection cost, incl. 220 kV substation & 220 kV aerial line 1.2 km – payable to TSO [EUR/MWp] Eur 62,500 (w/o VAT)
    110 kV substation cost + underground cables – own funds (EUR/MWp) Eur 42,000
    Grid aerial line 220 kV reinforcement cost -payable to TSO [EUR/MWp Eur 12,500
    Grid aerial line 220kV reinforcement, lenght [Km] 23.3
    Passage rights for connection to the grid secured Yes
    Other Permits (more than 10, according to CU) In progress
    Building Permit for PV parks & 220 kW connection line (AC) Within 60 days after signing SPA
    Set Up Authorization (ANRE) Upon BP
    Status Valid for all 4 projects Yes

    Basic Details

    Target Price:

    TBD

    Business ID:

    L#20240699

    Country

    Romania

    Detail

    Business ID:L#20240699
    Property Type:Renewable Energy
    Property Status:For Sale
    Target Price: TBD
    Contact M&A Advisor






      captcha

      Similar Businesses

      Published on July 8, 2024 at 5:40 pm. Updated on July 11, 2024 at 5:30 am


      Banca malese con 13 anni di storia

      PREVIOUS PROPERTY

      13-Year-Old Malaysian Bank

      NEXT PROPERTY

      Ambitious Italian FC Seeks Growth Funding

      The total project consist 4 projects and is located in the Southern part of Romania, which has the highest irradiation in the country.

      Romania is a great location as it has 210 sunny days per year and with an annual solar energy flux between 1,000 kWh/m2/year and 1,300 kWh/m2/year.

      All project’s authorizations are in progress, and the buyer can get the building permit within 60 days after signing the SPA.

      AC Capacity [41.125+32.725+30.625+30.625] MWac 135.100 MWac
      DC Capacity [43.090+40.610+37.820+38.440] MWdc 159.960 MWdc
      PV panels [TIGER NEO N-TYPE Bifacial with dual glass, JINKO SOLAR] 620W
      PV inverters [SUN2000-185KTL H1, HUAWEI] 175 kW / 185 kW
      Mounting systems Fixed
      One HV220KV substation for all 4 projects Yes
      Location Southern Romania
      Estimated Yearly Power Production (MWh/MWp) 1,450
      KMZ file available Yes
      Total Land Surface – 6 Plots (ha) 160
      Land ownership -SVP Leasing Leasing (Superficie)
      Land Leasing Cost (Eur/ha/Year) Eur 1,700
      Leasing Conditions Indexation: 5% or HICP | 32
      Land Type Agriculture, Complete flat
      Zoning (PUZ) N/A
      Natura 2000 Overlap No
      Flooding Risk No
      Archaeological Risk No
      Urban Certificate – Valid Yes
      Land Class (OSPA) 3
      Pedological Study Yes
      Topological Study In progress
      Geodesic Study In progress
      Environmental Permit In progress
      Solution Study Yes
      Distance to 220KV grid connection aerial line TSO (km) 1.2
      Connection Permits for 220 kV TSO grid Yes
      Grid connection cost, incl. 220 kV substation & 220 kV aerial line 1.2 km – payable to TSO [EUR/MWp] Eur 62,500 (w/o VAT)
      110 kV substation cost + underground cables – own funds (EUR/MWp) Eur 42,000
      Grid aerial line 220 kV reinforcement cost -payable to TSO [EUR/MWp Eur 12,500
      Grid aerial line 220kV reinforcement, lenght [Km] 23.3
      Passage rights for connection to the grid secured Yes
      Other Permits (more than 10, according to CU) In progress
      Building Permit for PV parks & 220 kW connection line (AC) Within 60 days after signing SPA
      Set Up Authorization (ANRE) Upon BP
      Status Valid for all 4 projects Yes