€870,000
Centrale fotovoltaica kazaka da 20 MW + GOV PPA

This profile summarizes two high-priority solar energy projects in the Calabria region that have reached the Ready-to-Build (RTB) stage. Both projects have successfully completed the Simplified Authorization Procedure (PAS) and ha ...

€870,000
TBD
TBD

This strategic investment, featuring a substantial capacity of 200 MW of power combined with 100 MWh of energy storage, represents a major step forward in creating a more flexible, reliable, and sustainable Italian electricity gri ...

TBD
TBD
TBD

This presentation outlines the key details of the Wind Farm Project, a fully authorized and strategically located renewable energy project. With an initial installed capacity of 28.6 MW and a clear path to expansion up to 40 MW, t ...

TBD
TBD

Crotone For Sale

This profile summarizes two high-priority solar energy projects in the Calabria region that have reached the Ready-to-Build (RTB) stage. Both projects have successfully completed the Simplified Authorization Procedure (PAS) and have achieved full legal efficacy through publication in the Official Bulletin of the Calabria Region (BURC).

Executive Summary

  • Total Capacity: 4,009.60kW

  • Status: Fully Permitted / Ready-to-Build (RTB).

  • Commercial Terms: Offered at €145,000 per MW.

  • Administrative Lead: XXXXXXXXXXX (Sole Director for both SPVs).

Project 1: Crotone Agrivoltaic

This project integrates renewable energy production with agricultural land use in the Crotone province.

  • SPV: XXXXXXXXXXX

  • Location: Loc. Colombra, Crotone (KR), XXXXXXXXXXX

  • Capacity: 1,999.20 kW.

  • Grid Connection (TICA): €270,000.

  • Permitting Timeline:

    • PAS Submission: December 11, 2025.

    • Completion/Perfection: January 12, 2026.

    • BURC Publication: January 22, 2026 (BURC No. 15).

Project 2: Pizzo Photovoltaic

Located in the Vibo Valentia province on land pre-identified as suitable for solar development.

  • SPV: XXXXXXXXXXX S.R.L..

  • Location: Pizzo (VV), XXXXXXXXXXX

  • Capacity: 4,010.4kW

  • Grid Connection (TICA): €422,000.

  • Substation Proximity: 1.5 km.

  • Permitting Timeline:

    • PAS Submission: November 19, 2025.

    • Completion/Perfection: December 28, 2025.

    • BURC Publication: January 7, 2026 (BURC No. 3).

Investment Highlights

  • Legal Certainty: Titles are fully opposable to third parties as the publication in the BURC has triggered the statutory limitation periods for any appeals.

  • Compliance: Both projects were authorized under the latest legislative framework (D.lgs 190/2024).

  • Strategic Positioning: Projects are located in high-irradiance zones in Southern Italy with clear land identification and connection parameters.