© 2025 MergersCorp M&A International.
© 2025 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities (“Members”) located throughout the world to provide Investment Banking, Corporate Finance, and Advisory Services and other client-related professional services. The Member Firms (“Members”) are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit our Disclaimer: https://mergerscorp.com/disclaimer. MergersCorp M&A International's franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited, a UK Company with its registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
MergersCorp M&A International provides strategic business advisory services, including preparing companies for growth and capital access. Through partnerships with licensed investment bankers, clients can access tailored capital-raising solutions.
U.S. Investment Banking Securities transactions are exclusively conducted by Spektrum Capital Advisors LLC, a Registered Representative of, and Securities Products offered through, BA Securities, LLC, a FINRA-registered broker-dealer. Check the background of investment professionals associated with this site on Broker Check.
The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.
The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water
The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.
The total installed flow, minus the biological minimum, is: Qins = 916 l / s
All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
© 2025 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities (“Members”) located throughout the world to provide Investment Banking, Corporate Finance, and Advisory Services and other client-related professional services. The Member Firms (“Members”) are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit our Disclaimer: https://mergerscorp.com/disclaimer. MergersCorp M&A International's franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited, a UK Company with its registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
MergersCorp M&A International provides strategic business advisory services, including preparing companies for growth and capital access. Through partnerships with licensed investment bankers, clients can access tailored capital-raising solutions.
U.S. Investment Banking Securities transactions are exclusively conducted by Spektrum Capital Advisors LLC, a Registered Representative of, and Securities Products offered through, BA Securities, LLC, a FINRA-registered broker-dealer. Check the background of investment professionals associated with this site on Broker Check.
This website is operated by MergersUS Inc a US Corporation with registered office at
Notifications
Description
The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.
HHP 1
The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water
HHP 2
The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.
The total installed flow, minus the biological minimum, is: Qins = 916 l / s
All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
CAPEX
Revenues 2015 – 2023
Basic Details
Target Price:
€3,750,000
Gross Revenue
€720,939
EBITDA
TBA
Business ID:
L#20240744
Country
Serbia
Detail
Similar Businesses
Published on September 23, 2024 at 1:11 pm. Updated on October 9, 2024 at 2:45 pm
350MW PV Ready to Build Project
TBD
Renewable Energy
95 MWp Operational PV Project
$74,000,000
Renewable Energy
62.50 MW PV Photovoltaic Project
$8,500,000
Renewable Energy
50MW Montenegrin PV Solar Photovoltaic Power Plant
TBD
Renewable Energy
50MW Hydro Power Plant with GOV PPA – 87 USD/MW for 20-Years
TBA
Renewable Energy
1,350 MW Ready To Build Wind Farm Project
$44,000,000
Renewable Energy
PREVIOUS PROPERTY
50+Year Old Vintage Swiss Trust Company with a Para-Banking-License & Crypto
NEXT PROPERTY
540MWp Offshore Wind Farm