© 2024 MergersCorp M&A International.
© 2024 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.
The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water
The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.
The total installed flow, minus the biological minimum, is: Qins = 916 l / s
All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
© 2024 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
This website is operated by MergersUS Inc a US Corporation with registered office at
Error: Contact form not found.
Error: Contact form not found.
Error: Contact form not found.
Error: Contact form not found.
Description
The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.
HHP 1
The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water
HHP 2
The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.
The total installed flow, minus the biological minimum, is: Qins = 916 l / s
All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.
Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.
CAPEX
Revenues 2015 – 2023
Basic Details
Target Price:
€3,750,000
Gross Revenue
€720,939
EBITDA
TBA
Business ID:
L#20240744
Country
Serbia
Detail
Similar Businesses
Published on September 23, 2024 at 1:11 pm. Updated on October 9, 2024 at 2:45 pm
20,9MW Portfolio of Turkish Hydro Power Plants
TBD
Renewable Energy
10MW-Hydro Power Plant
$5,000,000
Renewable Energy
83MW Solar Photovoltaic Power Plants
$10,855,000
Renewable Energy
11-GWp Photovoltaics (PV) Project Pipeline in USA
$150,000,000
Renewable Energy
7.50MW Italian PV Solar Photovoltaic Power Plant
€1,700,000
Renewable Energy
48,2 MWp Portfolio of PV Photovoltaic Solar Power Plants
$55,500,000
Renewable Energy
PREVIOUS PROPERTY
Swiss Para-Banking Forex, Money Transfer & CC Company with sub-accts
NEXT PROPERTY
540MWp Offshore Wind Farm