Contact M&A Advisor






    captcha

    989kW + 630kW 2x HPP Operational Hydro Power Plants

    Description

    L#20240744

    The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.

    HHP 1

    The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.

    Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

    This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water

    HHP 2

    The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.

    The total installed flow, minus the biological minimum, is: Qins = 916 l / s

    All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.

    Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

    CAPEX

    Revenues 2015 – 2023

    Basic Details

    Target Price:

    €3,750,000

    Gross Revenue

    €720,939

    EBITDA

    TBA

    Business ID:

    L#20240744

    Country

    Serbia

    Detail

    Business ID:L#20240744
    Property Type:Renewable Energy
    Property Status:For Sale
    Target Price: €3,750,000
    Gross Revenue:€720,939
    EBITDA:TBA
    Target Price / Revenue:5.2x
    Target Price / EBITDA:3750000x
    Contact M&A Advisor






      captcha

      Similar Businesses

      Published on September 23, 2024 at 1:11 pm. Updated on October 9, 2024 at 2:45 pm


      PREVIOUS PROPERTY

      Swiss Para-Banking Forex, Money Transfer & CC Company with sub-accts

      NEXT PROPERTY

      540MWp Offshore Wind Farm

      The company has constructed and operated two Hydro Power Plants in Serbia with installed capacity equal to 989kW + 630kW.

      HHP 1

      The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.

      Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

      This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water

      HHP 2

      The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.

      The total installed flow, minus the biological minimum, is: Qins = 916 l / s

      All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.

      Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

      CAPEX

      Revenues 2015 – 2023

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1