This is a 12.5 MW photovoltaic power plant project located in a high solar yield zone in Southeast Europe. Offered through a newly created company, the investment includes ownership of both the plant and the land it occupies. The ...

€14,442,500
TBD
property

12.5MW PV Photovoltaic Power Plant

EBITDA

TBD

Gross

TBD

Price

€14,442,500

Businesses for sale in Bosnia and Herzegovina

Bosnia and Herzegovina, situated in Southeast Europe, is a country with a rich cultural tapestry and a tumultuous history. Characterized by stunning landscapes, it encompasses mountains, rivers, and diverse flora. Sarajevo, the capital, serves as a testament to its blend of Eastern and Western influences, reflecting its complex past. The nation emerged from the dissolution of Yugoslavia, experiencing a devastating conflict in the 1990s. Presently, it is a constitutional federal republic, comprising multiple ethnic groups. Despite post-war challenges, Bosnia and Herzegovina strives for stability, fostering a unique blend of traditions and fostering a resilient spirit among its people.

This is a 12.5 MW photovoltaic power plant project located in a high solar yield zone in Southeast Europe. Offered through a newly created company, the investment includes ownership of both the plant and the land it occupies. The development includes grid access rights via a 110 kV transformer station capable of transmitting up to 29.95 MW (AC). The medium voltage connection line is also included. The asset is structured for long-term returns and stability, with additional rental agreements in place covering transformer station usage for a 20-year period. The power plant will be fully constructed in June 2026.

PV Modules

  • Models: RISEN ENERGY RSM132-8-695BHDG and PhonoSolar PS695M13GFH-22WSH
  • Power: 695 Wp each
  • Efficiency: 22.4%
  • Cell Type: n-type HJT

Inverters

  • Brand: Sungrow SG350HX
  • AC Output: Up to 352 kVA
  • Efficiency: 99.02%

Energy Management

  • Unit: Sungrow EMU200A
  • Supports 300+ devices, IP65 protection

Transformer Stations

  • Type: DELING doo Tuzla, KTS-31
  • Rated Power: Up to 3,150 kVA
  • Fully compliant with IEC 62271-202 standards

SPV Sale: Full sale of the newly formed company owning the PV plant and land

Key Highlights:

  • Constructed PV plant
  • Legal ownership of land (15–20 hectares)
  • Medium voltage connection infrastructure
  • 110 kV transformer station access (for 29.95 MW AC)
  • Production of around 1100MWh / 1 MW yearly
  • Current PPA price is 80 EUR per MWp

Rental Terms: The grid connection infrastructure (items 3 and 4) will be leased for 20 years