© 2024 MergersCorp M&A International.
© 2024 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
The project involves the construction of a small hydro power plant (hereinafter referred to as “SHPP”) with a capacity of 5.4 MW at a potential site located on the Talas River, Talas District, Talas Region. The topography of the terrain makes it possible to build the SHPP with an open-flow intake system.
The location of the SHPP was chosen given the highest slope with maximum development of the river hydroelectric potential.
The potential annual electric energy output is 36.8 million kWh.
The location of the intake has been chosen taking into consideration the topography.
of the terrain. The open-flow intake system will be 5.6 meters long. The total pressure will be 50 meters and the average slope of the pressure intake system will be 8.9 meters per kilometer.
The preliminary total area of land plot allocated for the construction of the main structures of the SHPP is 20.2.
hectares, including water intake (6.3 ha), diversion canal (11.0 ha), power house and appurtenant structures (2.9 ha).
The location of the SHPP was chosen given the highest slope with maximum.
development of the river hydroelectric potential. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.
Nearby 110/35/10 kV Chat Bazaar substation. The capacity of substation is 25,000 kVA. The aerial line to connect to the Chat Bazaar substation is 7.3 km long. The nearby 8,000 kVA 35/10 kV Kyrk-Kazyk substation. Taking into account the potential capacity of the SHPP and the distance from the SHPP to the substation, the construction of a 35 kV aerial line and a 35 kV step-up substation is necessary. According to Google Maps, the length of the 35 kV aerial line connecting the Small HPP switchyard with the “Chat Bazaar” substation will be 2.7 km.
Advantageous location of the facility. The location of the HPP was chosen taking into account the highest slope with maximum development of hydroelectric potential of the river. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.
The topography of the terrain makes possible the construction of an HPP with an open-flow intake system, which reduces the project cost.
High hydroelectric potential. The hydroelectric potential of the country is 142 billion kWh. The Kyrgyz Republic ranks third in the CIS in terms of the HPP and SHPP capacity.
Low development of the potential. As of 2021, the utilization rate is 10% of the total hydroelectric potential of the country.
High capacity of HPP cascades. According to experts, the total capacity of prospective HPP cascades is 5,600 billion kWh.
CASA-1000. The Kyrgyz Republic is a member of the CASA-1000 project aimed at creating a power line linking Central and South Asia.
Project cost – $8,375,960
Amount of investments – $8,375,960
Payback period – 6.35 years
© 2024 MergersCorp M&A International is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States.
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom.
This website is operated by MergersUS Inc a US Corporation with registered office at
Error: Contact form not found.
Error: Contact form not found.
Error: Contact form not found.
Error: Contact form not found.
Description
The project involves the construction of a small hydro power plant (hereinafter referred to as “SHPP”) with a capacity of 5.4 MW at a potential site located on the Talas River, Talas District, Talas Region. The topography of the terrain makes it possible to build the SHPP with an open-flow intake system.
The location of the SHPP was chosen given the highest slope with maximum development of the river hydroelectric potential.
The potential annual electric energy output is 36.8 million kWh.
Overview
The location of the intake has been chosen taking into consideration the topography.
of the terrain. The open-flow intake system will be 5.6 meters long. The total pressure will be 50 meters and the average slope of the pressure intake system will be 8.9 meters per kilometer.
The preliminary total area of land plot allocated for the construction of the main structures of the SHPP is 20.2.
hectares, including water intake (6.3 ha), diversion canal (11.0 ha), power house and appurtenant structures (2.9 ha).
The location of the SHPP was chosen given the highest slope with maximum.
development of the river hydroelectric potential. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.
Keypoints
Nearby 110/35/10 kV Chat Bazaar substation. The capacity of substation is 25,000 kVA. The aerial line to connect to the Chat Bazaar substation is 7.3 km long. The nearby 8,000 kVA 35/10 kV Kyrk-Kazyk substation. Taking into account the potential capacity of the SHPP and the distance from the SHPP to the substation, the construction of a 35 kV aerial line and a 35 kV step-up substation is necessary. According to Google Maps, the length of the 35 kV aerial line connecting the Small HPP switchyard with the “Chat Bazaar” substation will be 2.7 km.
Advantageous location of the facility. The location of the HPP was chosen taking into account the highest slope with maximum development of hydroelectric potential of the river. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.
The topography of the terrain makes possible the construction of an HPP with an open-flow intake system, which reduces the project cost.
High hydroelectric potential. The hydroelectric potential of the country is 142 billion kWh. The Kyrgyz Republic ranks third in the CIS in terms of the HPP and SHPP capacity.
Low development of the potential. As of 2021, the utilization rate is 10% of the total hydroelectric potential of the country.
High capacity of HPP cascades. According to experts, the total capacity of prospective HPP cascades is 5,600 billion kWh.
CASA-1000. The Kyrgyz Republic is a member of the CASA-1000 project aimed at creating a power line linking Central and South Asia.
Status
Financials
Project cost – $8,375,960
Amount of investments – $8,375,960
Payback period – 6.35 years
Basic Details
Target Price:
$8,990,000
Gross Revenue
TBA
EBITDA
TBA
Business ID:
L#20240646
Country
Kyrgyzstan
Detail
Similar Businesses
Published on April 23, 2024 at 9:42 pm. Updated on April 23, 2024 at 9:44 pm
84 MW PV Photovoltaic Park
TBD
Renewable Energy
3x 28MW + 31MW + 31MW Wind Power Plants Pipeline
TBD
Renewable Energy
20,9MW Portfolio of Turkish Hydro Power Plants
TBD
Renewable Energy
220kW Italian Hydro Power Plant
€1,100,000
Renewable Energy
33MW 4x HPP Hydro Power Plant
$12,500,000
Renewable Energy
7x Portfolio Hydroelectric Power Plants in Italy with 20 Years PPA [19GWh]
€29,000,000
Renewable Energy
PREVIOUS PROPERTY
Meat & Produce Retailer with Half-Century’s Establishment
NEXT PROPERTY
4.20MW Italian PV Solar Photovoltaic Power Plant