$8,990,000TBA/EBITDA
Centrale idroelettrica HPP da 5,4MW

The project involves the construction of a small hydro power plant (hereinafter referred to as “SHPP”) with a capacity of 5.4 MW at a potential site located on the Talas River, Talas District, Talas Region. The topography of t ...

$8,990,000TBA/EBITDA
TBA
$25,000,000$2,293,868/EBITDA

A 19.6MW Biomass Power Plant for Sale in the Northeast U.S.A Overview The company has remained at the forefront of the local power provision, overseeing the operation of an advanced 19.6MW wood-fired electrical power biomass g ...

$25,000,000$2,293,868/EBITDA
$2,293,868
TBD
Centrale eolica WPP da 100 MW + GOV PPA

Wind power is swiftly becoming a popular source of clean and renewable energy around the world, and Kazakhstan is no exception. This 100MW Ready to Build WPP Wind Power Plant is located in a prime wind energy region in Kazakhst ...

TBD
TBD
TBD
Centrale fotovoltaica kazaka da 20 MW + GOV PPA

Kazakhstan has been making significant strides in the field of renewable energy, particularly with the development of solar power plants in recent years. The country's vast open spaces and abundant sunlight make it an ideal locati ...

TBD
TBD
TBD
Pipeline impianti eolici 28MW + 31MW + 31MW
Italy | Renewable Energy | L#20240621

Italy has been at the forefront of renewable energy development in Europe, with wind power playing a significant role in the country's transition towards a more sustainable and environmentally friendly energy mix. With its favorab ...

TBD
TBD
TBA

Hydropower plants in Kazakhstan have played a significant role in the country's energy sector for many years. Kazakhstan boasts large rivers and abundant water resources, making it an ideal location for the development of hydropow ...

TBA
TBA
$150,000,000
Attività di Esplorazione Geotermica
Turkey | Renewable Energy | L#20230575

Geothermal Exploration Business operation license number located in Salihli district, approximately 55 km southeast of Manisa province, and covers an area of 4939.32 hectares. Many geophysical studies have been carried out by d ...

$150,000,000
TBD
$250,000,000$26,000,000/EBITDA
Nepal | Renewable Energy | L#20230535

For sale a Portfolio of 3x Brand New Hydro Power Plants (HPP) located in Nepal with an installed capacity of 200 MW. The source of energy shares from a conventional source in Nepal is 87% with a significant share in Renewable Ener ...

$250,000,000$26,000,000/EBITDA
$26,000,000
$12,500,000TBD/EBITDA

Kazakhstan has abundant hydro resources, which are mainly concentrated in the eastern and southern parts of the country.  Today, 15 large hydropower stations (>50 MW) with a total capacity of 2.25 GW account for up to 13 per c ...

$12,500,000TBD/EBITDA
TBD
property

5,4MW Hydro Power Plant HPP

EBITDA

TBA

Gross

TBA

Price

$8,990,000
property

19.6 MW Biomass Power Plant for Sale in the U.S

EBITDA

$2,293,868

Gross

$18,356,578

Price

$25,000,000
property

100MW WPP Wind Power Plant + GOV PPA

EBITDA

TBD

Gross

TBD

Price

TBD
property

20MW Kazakh PV Photovoltaic Power Plant + GOV PPA

EBITDA

TBD

Gross

TBD

Price

TBD
property

3x 28MW + 31MW + 31MW Wind Power Plants Pipeline

EBITDA

TBD

Gross

TBD

Price

TBD
property

50MW Hydro Power Plant with GOV PPA – 87 USD/MW for 20-Years

EBITDA

TBA

Gross

TBA

Price

TBA
property

Geothermal Exploration Business

EBITDA

TBD

Gross

TBD

Price

$150,000,000
property

Portfolio of 3x Brand New HPP Hydro Power Plants [approx 200MW]

EBITDA

$26,000,000

Gross

$30,600,000

Price

$250,000,000
property

33MW 4x HPP Hydro Power Plant

EBITDA

TBD

Gross

TBD

Price

$12,500,000

Renewable Energy For Sale

Power Plant for Sale, Find the Best Established Power Plant for Sale, Power Plant for Sale Marketplace, Buy a Power Plant in, Power Plant Companies for Sale, Discover opportunities for entrepreneurs in the United States, Power Plant Companies for sale. Browse the Best Power Plant for Sale Available to Buy Now, Power Plant

The project involves the construction of a small hydro power plant (hereinafter referred to as “SHPP”) with a capacity of 5.4 MW at a potential site located on the Talas River, Talas District, Talas Region. The topography of the terrain makes it possible to build the SHPP with an open-flow intake system.

The location of the SHPP was chosen given the highest slope with maximum development of the river hydroelectric potential.

The potential annual electric energy output is 36.8 million kWh.

Overview

The location of the intake has been chosen taking into consideration the topography.

of the terrain. The open-flow intake system will be 5.6 meters long. The total pressure will be 50 meters and the average slope of the pressure intake system will be 8.9 meters per kilometer.

The preliminary total area of land plot allocated for the construction of the main structures of the SHPP is 20.2.

hectares, including water intake (6.3 ha), diversion canal (11.0 ha), power house and appurtenant structures (2.9 ha).

The location of the SHPP was chosen given the highest slope with maximum.

development of the river hydroelectric potential. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.

Keypoints

Nearby 110/35/10 kV Chat Bazaar substation. The capacity of substation is 25,000 kVA. The aerial line to connect to the Chat Bazaar substation is 7.3 km long. The nearby 8,000 kVA 35/10 kV Kyrk-Kazyk substation. Taking into account the potential capacity of the SHPP and the distance from the SHPP to the substation, the construction of a 35 kV aerial line and a 35 kV step-up substation is necessary. According to Google Maps, the length of the 35 kV aerial line connecting the Small HPP switchyard with the “Chat Bazaar” substation will be 2.7 km.

Advantageous location of the facility. The location of the HPP was chosen taking into account the highest slope with maximum development of hydroelectric potential of the river. Access roads to the water intake on the right shore – there is a field road along the diversion canal, to the station building on the left shore.

The topography of the terrain makes possible the construction of an HPP with an open-flow intake system, which reduces the project cost.

High hydroelectric potential. The hydroelectric potential of the country is 142 billion kWh. The Kyrgyz Republic ranks third in the CIS in terms of the HPP and SHPP capacity.

Low development of the potential. As of 2021, the utilization rate is 10% of the total hydroelectric potential of the country.

High capacity of HPP cascades. According to experts, the total capacity of prospective HPP cascades is 5,600 billion kWh.

CASA-1000. The Kyrgyz Republic is a member of the CASA-1000 project aimed at creating a power line linking Central and South Asia.

Status

  • Ready to Build (RTB)

Financials

Project cost – $8,375,960

  • Hydraulic structure – $3,327,333
  • Hydromechanical structure – $2,740,000
  • Electrical structure – $1,280,000
  • Unforeseen expenses – $587,787
  • Administrative expenses – $440,840

Amount of investments – $8,375,960
Payback period – 6.35 years

MergersCorp M&A
International As Seen On

  • brand 1
  • brand 1
  • brand 1
  • brand 1
  • brand 1