A purpose-built, brownfield data center campus in Liverpool, England, strategically positioned to serve the Liverpool and Greater Manchester markets as an alternative to congested UK hubs.
Full planning approval was secured in March 2026. A valuable 50MVA / 132kV grid connection is already locked in with SP Energy Networks to support an estimated 33MW of IT load (phased deployment).
Integrated into the Liverpool Connectivity Strategy via a resilient 222km dark fiber network, offering low-latency access to eight subsea cable landing stations and excellent highway/rail logistics.
Favorable site characteristics featuring low environmental risk (weather, seismic, topography, and river flooding) and a development-ready footprint.
A rare, highly de-risked UK opportunity combining secured high-capacity power, approved zoning, and robust international fiber connectivity during a period of severe power scarcity across European markets.
| Metric |
Phase 1 (11 MW) |
Phase 2 (11 MW) |
Phase 3 (11 MW) |
Fully Stabilized (33 MW) |
| Contracted IT Load (90% utilization) |
9.9 MW |
9.9 MW |
9.9 MW |
29.7 MW Net Billed |
| Blended Rate |
GBP 165 / kW / mo |
GBP 165 / kW / mo |
GBP 165 / kW / mo |
— |
| Gross Annual Revenue |
GBP 19.6M |
GBP 19.6M |
GBP 19.6M |
GBP 58.8M / year |
| Estimated Operating Expenses (OpEx) |
(GBP 3.9M) |
(GBP 3.9M) |
(GBP 3.9M) |
(GBP 11.7M / year) |
| Net Stabilized EBITDA |
GBP 15.7M |
GBP 15.7M |
GBP 15.7M |
GBP 47.1M / year |
| Estimated CapEx Investment |
GBP 120M |
GBP 105M |
GBP 105M |
GBP 330M Total |