    2.33 MWp Italian PV Photovoltaic Project RTB

    Description

    L#20250823

    The preliminary project focuses on the establishment of a photovoltaic system with a nominal capacity of 2,334.28 kWp, located within the Municipality of Santa Maria la Fossa (CE), Italy.

    System Design and Specifications

    The photovoltaic panels will be installed utilizing a tracking system, occupying an area of 10,720 m² within a total project area of 38,876 m². This results in a land usage of 27.76%, which is compliant with the permissible percentage for industrial zones.

    The primary objective of this photovoltaic system is to generate electrical energy to be fed into the medium-voltage alternating current distribution grid.

    System Configuration

    The photovoltaic generator will be segmented into two sub-fields, each corresponding to one inverter.

    • Inverter Infrastructure
      • The project will feature two inverter cabins, each housing a 1000 kWp ABB inverter.
    • Subfield Details
      • Subfield A: Comprising 67 parallel strings of 26 modules, achieving a total power output of 1,167.14 kWp.
      • Subfield B: Similarly structured with 67 parallel strings of 26 modules, also resulting in a total power output of 1,167.14 kWp.

    The inverter rooms will be strategically positioned to optimize proximity to the photovoltaic field, ensuring efficient operation and maintenance.

    Equipment Specifications

    Each inverter room will be constructed as a prefabricated SMA monoblock unit, containing the following equipment:

    • ABB inverter model PVS800-57-1000kW-C, inclusive of both DC and AC panels integrated into the unit.
    • A certified energy measurement group for assessing produced energy, installed on the AC side at low voltage (semi-direct insertion).

    Additionally, a 0.6/20 kV 1250 kVA step-up transformer will be installed in a concrete enclosure adjacent to the inverter cabin. This transformer will be supplied by ABB and will include the necessary incoming devices from the medium-voltage cabin, along with protection, sectioning, and earthing devices as required on-site.

    This initiative represents a significant advancement in renewable energy infrastructure within the region, aligning with both corporate sustainability goals and local regulatory standards.

    Land Leasing Fees

    The fee for the granting of surface rights for the specified area is set at €538,524.00. When this total is distributed over a period of 40 years, it results in annual installments of €3,500.

    Basic Details

    Target Price:

    TBD

    Business ID:

    L#20250823

    Country

    Italy

    Detail

    Business ID:L#20250823
    Target Price: TBD
    Contact M&A Advisor






      Similar Businesses

      Published on January 25, 2025 at 9:55 am. Updated on January 25, 2025 at 10:27 am


      PREVIOUS PROPERTY

      6.627 MWp Italian PV Photovoltaic Project RTB

      NEXT PROPERTY

      2.99 MWp Italian PV Photovoltaic Project RTB + Land + EPC

      The preliminary project focuses on the establishment of a photovoltaic system with a nominal capacity of 2,334.28 kWp, located within the Municipality of Santa Maria la Fossa (CE), Italy.

      System Design and Specifications

      The photovoltaic panels will be installed utilizing a tracking system, occupying an area of 10,720 m² within a total project area of 38,876 m². This results in a land usage of 27.76%, which is compliant with the permissible percentage for industrial zones.

      The primary objective of this photovoltaic system is to generate electrical energy to be fed into the medium-voltage alternating current distribution grid.

      System Configuration

      The photovoltaic generator will be segmented into two sub-fields, each corresponding to one inverter.

      The inverter rooms will be strategically positioned to optimize proximity to the photovoltaic field, ensuring efficient operation and maintenance.

      Equipment Specifications

      Each inverter room will be constructed as a prefabricated SMA monoblock unit, containing the following equipment:

      Additionally, a 0.6/20 kV 1250 kVA step-up transformer will be installed in a concrete enclosure adjacent to the inverter cabin. This transformer will be supplied by ABB and will include the necessary incoming devices from the medium-voltage cabin, along with protection, sectioning, and earthing devices as required on-site.

      This initiative represents a significant advancement in renewable energy infrastructure within the region, aligning with both corporate sustainability goals and local regulatory standards.

      Land Leasing Fees

      The fee for the granting of surface rights for the specified area is set at €538,524.00. When this total is distributed over a period of 40 years, it results in annual installments of €3,500.