Opens in a new tab

US Former Energizer Manufacturing Facility + 27 MW (Dedicated On-Site Substation)

US Former Energizer Manufacturing Facility + 27 MW (Dedicated On-Site Substation)
Industry
Technology
Listing ID
L#20261178
Target Price
$16,500,000
Revenue
TBD
EBITDA
TBA

Description

The property presents a rare industrial land and heavy-power acquisition opportunity situated within north-central Florida’s primary commerce and research corridor. The facility offers significant existing utility infrastructure, substantial acreage for campus-style expansion, and an aggressive power capacity profile capable of supporting high-intensity industrial or compute operations.

Key Metric Property Detail Strategic Implication
Site Area 104 Gross Acres Sufficient footprint for multi-building expansion, phased development, or large-scale yard requirements
Current Power 27 MW (Dedicated On-Site Substation) Immediate bypass of standard utility queue wait times (typically 24–48 months)
Expansion Power Scalable to 57 MW Path toward hyperscale-adjacent compute or heavy manufacturing
List Price $16,500,000 ~$158,654/acre (inclusive of all existing site improvements and power assets)

Infrastructure & Critical Utility Profile

Dedicated Power Delivery

The on-site electrical substation provides direct, high-capacity throughput, isolating operations from standard distribution congestion.

Immediate vs. Future Load

27 MW is readily serviceable for near-term commissioning, with engineering pathways identified to scale transmission access up to 57 MW.

Logistics & Accessibility

Frontage along US Highway 441 provides direct access to Interstate 75 (Alachua/Gainesville hub), facilitating freight transit and workforce accessibility from the Greater Gainesville/University of Florida talent pool.

Preliminary Alignment & Next Steps

This asset aligns with clients seeking rapid speed-to-power delivery where standard greenfield utility timelines are unviable.

  1. Utility Capacity Verification: Request formal load letters and interconnect agreements with the serving utility (Duke Energy or local cooperative) to verify current breaker/transformer ratings and timeline requirements to achieve the 57 MW threshold.
  2. Environmental & Structural Due Diligence: Review Phase I/II Environmental Site Assessments (ESAs) relative to historical battery manufacturing use, alongside building floor load ratings and clear heights.
  3. Zoning & Permitting Review: Confirm municipal entitlements within Alachua County for target end-use classification (e.g., Light/Heavy Industrial, Data Center, Specialized Manufacturing).

Basic Details

Listing ID
L#20261178
Country
United States
Industry
Technology
Deal Status
Available
Target Price
$16,500,000
Revenue
TBD
EBITDA
TBA
Revenue Multiple
TBD
EBITDA Multiple
TBD

M&A Middle Market Advisory Deal Tombstones 2024

AdvisorDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Businesses for Sale

Similar Opportunities