Opens in a new tab

100-MWp Solar PV Photovoltaic Farm in Kosovo (RTB)

Country
KosovoKosovo
Listing ID
L#20261047
Target Price
$25,000,000
Revenue
$10,560,000
EBITDA
$9,460,000

Description

The Kosovo 100 MW Solar PV Project is a strategically located renewable energy development designed to support Kosovo’s growing electricity demand and accelerate its long-term energy transition.

With all key permits secured and grid connection approved, the project is currently in its final pre-construction phase, fully positioned for immediate investment and construction readiness.

Key Project Highlights

  1. 01
    Installed Capacity100 MWp
  2. 02
    Expected Annual Generation177,500 MWh
  3. 03
    Yield Factor1,775 kWh per kWp installed
  4. 04
    Grid ConnectionApproved and secured 110 kV transmission line
  5. 05
    Land & PermitsFully secured (environmental, land-use, construction permits)
  6. 06
    Project StatusAdvanced development stage – ready for construction

Financial Overview

  1. 01
    Total Project CAPEX€90 million
  2. 02
    Annual OPEX€1.46 million
  3. 03
    Revenue PotentialAt €62/MWh tariff, projected annual revenue of ~€12.8 million
  4. 04
    Average Annual Net Cash Flow~€11.4 million
  5. 05
    Equity IRR15%
  6. 06
    Equity Payback Period5.5 years
  7. 07
    NPV (12% discount rate)€7.2 million
  8. 08
    Levelized Cost of Energy (LCOE)€30/MWh
  9. 09
    FinancingSenior debt financing has been successfully secured and ratified via banking institutions.

Market & Investment Potential

Kosovo is actively pursuing a strategic diversification of its energy mix, with a strong focus on reducing reliance on coal and expanding renewable energy capacity.

The project is fully aligned with national energy transition objectives and EU integration goals, particularly in emissions reduction and clean energy expansion.

With a fully secured permitting package and approved grid connection, the project offers a significantly de-risked development profile and a clear execution pathway.

Once operational, the plant will deliver long-term, low-cost renewable energy to the national grid, supporting both energy security and sustainability targets.

Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.

Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.

Disclaimer

All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.

Financial Forecast

Financial / Technical Parameter Value / Detail
Listing Status / Location Ready-to-Build (RTB) / Kosovo
Installed Capacity 100 MWp
Target Price TBD (Disclosed via NDA)
Estimated Total CAPEX ~€70,000,000 – €75,000,000 EUR (~€0.70M–€0.75M per MW)
Expected Annual Generation ~160,000 MWh (Yield Factor: ~1,600 kWh/kWp)
Assumed Power Tariff ~€66 / MWh
Estimated Annual Gross Revenue ~€10,560,000 EUR
Estimated Annual OPEX ~€1,100,000 EUR (O&M, land lease, insurance, admin)
Estimated Annual EBITDA ~€9,460,000 EUR (Revenue minus OPEX)
Implied EBITDA Margin ~89.6%

Basic Details

Listing ID
L#20261047
Country
Kosovo
Industry
Renewable energy
Deal Status
Available
Target Price
$25,000,000
Revenue
$10,560,000
EBITDA
$9,460,000
Revenue Multiple
2.37x
EBITDA Multiple
2.64x

M&A Middle Market Advisory Deal Tombstones 2024

AdvisorDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Businesses for Sale

Similar Opportunities