Opens in a new tab

12 MW Hydropower Plant (2 × 6 MW Units) RTB + GOV PPA

Country
KazakhstanKazakhstan
Listing ID
L#20251049
Target Price
$7,500,000
Revenue
$4,500,000
EBITDA
$3,500,000

Description

The Hydropower Plant Cascade project represents a key development in the renewable energy infrastructure of the Almaty Region.

This initiative is structured as a cascade system, featuring two hydroelectric power plants: HPP-1 and HPP-2. Together, they offer a substantial total installed capacity of 12 MW, with each plant contributing 6 MW of clean energy.

The location in the Almaty Region is ideal, chosen specifically for its strong hydrological potential—an abundant and reliable water resource necessary for consistent hydropower generation. Furthermore, the region is recognized for its well-established renewable energy sector, allowing the project to seamlessly integrate with existing infrastructure and support the area's transition to sustainable power. This project is set to be a reliable, long-term source of green electricity.

Kazakhstan has significant hydropower resources, with an estimated 170 billion kWh of gross potential and 62 billion kWh of feasible potential. This River is located within the country’s South-Eastern hydropower zone, a priority area for small HP expansion to support Kazakhstan’s long-term renewable energy targets.

The project has been designed based on detailed topographic and hydrological assessments, and the environmental safety of the facility.

Each HPP of the cascade is a combination of hydraulic structures and electromechanical equipment that convert the gravitational energy of the water flow into electrical energy for delivery to the regional grid. The expected lifespan of the plant is 25-35 years, with potential for significantly longer service life given standard refurbishment cycles typical in hydropower assets.

Main technical and economic parameters of the designed HPP-1 & HPP2

Name (indicator) Units of
measurement
Value of the
indicator (HPP1)
Value of the
indicator (HPP2)
Recommended (indicative) installed power MW 2х3’000 2х3’000
Head (gross) m 167,271 167,271
Working pressure (net), m m 157,33—166,79 157,33—166,79
Maximum water flow through the turbine m3/s 4,7 4,7
Indicative volume of electricity generation million kWh 28,964 24,448

Indicative unified main technical and economic parameters of the designed HPP Cascade (HPP-1 and HPP-2)

Parameter name Units of
measurement
Value of the
indicator
Installed capacity kW 12 000,00
Electricity production (annual) million kWh 53,412
Construction cost (excluding IDC) thousand USD 19 998,93
Construction Cost (including IDC and loan charHPP) thousand USD 23 139,03
Specific capital investment per 1 kW USD per 1 kW 1 666,58
Specific capital investment per 1 kWh USD per 1 kW 0,37
Electricity tariff during the payback period (“fixed tariff”)* KZT per 1 kW*h 37,05
Net income in the first year of operation during the payback period thousand USD 3 498,43
Net income in the first year after the payback period thousand USD 5 995,70
Net Present Value (NPV) thousand USD 10 977,61
Internal Financial Rate of Return % 27,3
Payback period (discounted) years 9
Payback period (downtime) years 5,72
Profitability Index 1,38

Financial Forecast

Financial / Technical Parameter Value / Detail
Location / Project Name Almaty Region, Kazakhstan (Cascade HPP-1 & HPP-2)
Installed Capacity 12 MW (2 × 6 MW units)
Target Asking Price $7,500,000 USD
Projected Annual Generation 53.412 GWh (53,412,000 kWh)
PPA Fixed Tariff 37.05 KZT / kWh
Total Construction CAPEX (inc. IDC & Financing) $23,139,030 USD
Estimated Annual Gross Revenue ~$4,200,000 – $4,500,000 USD
Estimated Annual OPEX ~$700,000 – $1,000,000 USD
Estimated Annual EBITDA ~$3,500,000 – $3,800,000 USD
Implied EBITDA Margin ~83% – 88%
Year 1 Net Income (Payback Period) $3,498,430 USD
Post-Payback Annual Net Income $5,995,700 USD
Financial Internal Rate of Return (IRR) 27.3%
Discounted Payback Period 9.0 Years (5.72 years simple)
Net Present Value (NPV) $10,977,610 USD

Basic Details

Listing ID
L#20251049
Country
Kazakhstan
City
Almaty
Industry
Renewable energy
Deal Status
Available
Target Price
$7,500,000
Revenue
$4,500,000
EBITDA
$3,500,000
Revenue Multiple
1.67x
EBITDA Multiple
2.14x

M&A Middle Market Advisory Deal Tombstones 2024

AdvisorDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Businesses for Sale

Similar Opportunities