Contact M&A Advisor







    captcha

    248MWp Photovoltaic Solar PV Power Plant Pipeline Project

    Description

    L#20230447

    This Project is scheduled to be the first large utility scale solar PV installation in Kosovo, which has low renewables incidence (10%). It is located in a Favourable area with direct HV connection ensuring superior availability.

    Kosovo and the Western Balkans are in the early stages of de-carbonising their coal-based electricity systems, with attractive fundamentals.

    The Sponsors are looking for offers to acquire up to 100% of the equity in the Project SPV. Transaction closing is expected upon receipt of relevant permits and prior to the start of construction, with a significant majority of the purchase price due upon transaction completion.

    The Kosovar power system was created under the larger integrated Yugoslav power system. It relies predominantly on its two Yugoslav-era lignite power plants, Kosova A (610MW) and Kosova B (678MW), for electricity generation. However, this supply is unreliable; Kosova B had an emergency shut down in December 2021, leading to power cuts in the country. It currently has a low incidence of renewables at 10% of installed capacity, which consists of hydroelectric power plants, as well as recently built wind farms, and small scale PV plants.

    The project has been developed by a Sponsor group combining a strong local base with existing solar operations and large-scale development and investment experience in the Western Balkans Offers for EPC and O&M contracts from bankable counterparties.

    have been obtained

    Keypoints

      • 40 Years Leasing Agreement with the Landlord;
      • 12 Years PPA Agreement Executed;
      • P50 Yield (kWh/kWp) 1359
      • Start of Construction 2023
      • Landlord Private Individuals in Kosovo
      • Leasing Agreement for 41 Years
      • Total Yearly Production: 248MW X 1359= 337 GWh

    Below are the current feed-in tariffs in Kosovo for RES for current installations:

    Basic Details

    Target Price:

    €25,000,000

    Gross Revenue

    TBD

    EBITDA

    TBD

    Business ID:

    L#20230447

    Country

    Kosovo

    Detail

    Business ID:L#20230447
    Property Type:Power Plants
    Property Status:For Sale
    Target Price: €25,000,000
    Gross Revenue:TBD
    EBITDA:TBD
    Target Price / Revenue:25000000x
    Target Price / EBITDA:25000000x
    Contact M&A Advisor







      captcha

      Similar Businesses

      Published on March 31, 2023 at 1:31 pm. Updated on March 31, 2023 at 9:44 pm


      Water Factory Full Cycle for sale

      PREVIOUS PROPERTY

      Full-Cycle Water Factory with Maximum Automated process

      NEXT PROPERTY

      Manufacturer of Oil & Gas Equipments

      This Project is scheduled to be the first large utility scale solar PV installation in Kosovo, which has low renewables incidence (10%). It is located in a Favourable area with direct HV connection ensuring superior availability.

      Kosovo and the Western Balkans are in the early stages of de-carbonising their coal-based electricity systems, with attractive fundamentals.

      The Sponsors are looking for offers to acquire up to 100% of the equity in the Project SPV. Transaction closing is expected upon receipt of relevant permits and prior to the start of construction, with a significant majority of the purchase price due upon transaction completion.

      The Kosovar power system was created under the larger integrated Yugoslav power system. It relies predominantly on its two Yugoslav-era lignite power plants, Kosova A (610MW) and Kosova B (678MW), for electricity generation. However, this supply is unreliable; Kosova B had an emergency shut down in December 2021, leading to power cuts in the country. It currently has a low incidence of renewables at 10% of installed capacity, which consists of hydroelectric power plants, as well as recently built wind farms, and small scale PV plants.

      The project has been developed by a Sponsor group combining a strong local base with existing solar operations and large-scale development and investment experience in the Western Balkans Offers for EPC and O&M contracts from bankable counterparties.

      have been obtained

      Keypoints

      Below are the current feed-in tariffs in Kosovo for RES for current installations:

      MergersCorp M&A
      International As Seen On

      • brand 1
      • brand 1
      • brand 1
      • brand 1
      • brand 1